en.wanglianjt.cn Open in urlscan Pro
2600:9000:2670:cc00:15:aa7f:1840:93a1  Public Scan

URL: https://en.wanglianjt.cn/
Submission: On May 06 via api from US — Scanned from DE

Form analysis 1 forms found in the DOM

<form class="e_form-91 s_form_layout1 O_inquiry" needjs="true">
  <div class="cbox-91-0 p_formItem">
    <p class="e_text-85 s_title"> Message </p>
    <script src="/upload/js/3423cccba8ad49f69fe8963cf4775d8e.js?instance=undefined&amp;viewType=undefined&amp;v=undefined&amp;siteType=undefined"></script>
    <div class="e_input-88 s_form1 form-group " needjs="true" required="">
      <div class="">
        <div class="input-group">
          <input type="text" class="form-control s_form-control s_input p_input" name="text1706926720341" data-name="e_input-88" placeholder="Please enter a name">
          <div class="invalid-feedback"></div>
        </div>
      </div>
    </div>
    <div class="e_input-98 s_form1 form-group " needjs="true" required="">
      <div class="">
        <div class="input-group">
          <input type="text" class="form-control s_form-control s_input p_input" name="text1711609181758" data-name="e_input-98" placeholder="Please enter your phone number">
          <div class="invalid-feedback"></div>
        </div>
      </div>
    </div>
    <div class="e_input-96 s_form1 form-group  O_proWeb" needjs="true">
      <div class="">
        <div class="input-group">
          <input type="text" class="form-control s_form-control s_input p_input" name="e_input-96" placeholder="Website">
          <div class="invalid-feedback"></div>
        </div>
      </div>
    </div>
    <div class="e_textarea-89 s_form1 form-group " needjs="true" required="">
      <div class="">
        <textarea class="form-control s_form-control s_input p_input" rows="3" name="textarea" data-name="e_textarea-89" placeholder="Please enter message content"></textarea>
        <div class="invalid-feedback"></div>
      </div>
    </div>
    <a class="e_formBtn-90 s_button1 btn btn-primary" href="javascript:;" needjs="true">
    <span>Confirm</span> 
</a>
  </div>
  <input name="jumpPage" type="hidden" value="/successfully.html">
  <input name="i18nJson" type="hidden"
    value="{&quot;required_88&quot;:&quot;Please&nbsp;enter&nbsp;the&nbsp;required&nbsp;content&quot;,&quot;required_89&quot;:&quot;Please&nbsp;enter&nbsp;the&nbsp;required&nbsp;content&quot;,&quot;noData_72&quot;:&quot;No data&quot;,&quot;pageUnit_78&quot;:&quot;page&quot;,&quot;minLength_98&quot;:&quot;Your&nbsp;input&nbsp;shall&nbsp;be&nbsp;more&nbsp;than&nbsp;%len&nbsp;characters&quot;,&quot;minLength_96&quot;:&quot;Your&nbsp;input&nbsp;shall&nbsp;be&nbsp;more&nbsp;than&nbsp;%len&nbsp;characters&quot;,&quot;loadMore_78&quot;:&quot;Click to load more&quot;,&quot;conditions_78&quot;:&quot;condition:&quot;,&quot;maxLength_89&quot;:&quot;Your&nbsp;input&nbsp;shall&nbsp;not&nbsp;be&nbsp;more&nbsp;than&nbsp;%len&nbsp;characters&quot;,&quot;maxLength_88&quot;:&quot;Your&nbsp;input&nbsp;shall&nbsp;not&nbsp;be&nbsp;more&nbsp;than&nbsp;%len&nbsp;characters&quot;,&quot;required_96&quot;:&quot;Please&nbsp;enter&nbsp;the&nbsp;required&nbsp;content&quot;,&quot;required_98&quot;:&quot;Please&nbsp;enter&nbsp;the&nbsp;required&nbsp;content&quot;,&quot;pageWhole_78&quot;:&quot;in total&quot;,&quot;noData_78&quot;:&quot;No data&quot;,&quot;pageItem_78&quot;:&quot;picecs&quot;,&quot;minLength_89&quot;:&quot;Your&nbsp;input&nbsp;shall&nbsp;be&nbsp;more&nbsp;than&nbsp;%len&nbsp;characters&quot;,&quot;noMore_78&quot;:&quot;No more&quot;,&quot;loadNow_78&quot;:&quot;Loading&quot;,&quot;pageJump_78&quot;:&quot;proceed&quot;,&quot;totalAcount_78&quot;:&quot;Total X&quot;,&quot;minLength_88&quot;:&quot;Your&nbsp;input&nbsp;shall&nbsp;be&nbsp;more&nbsp;than&nbsp;%len&nbsp;characters&quot;,&quot;maxLength_96&quot;:&quot;Your&nbsp;input&nbsp;shall&nbsp;not&nbsp;be&nbsp;more&nbsp;than&nbsp;%len&nbsp;characters&quot;,&quot;confirm_78&quot;:&quot;OK&quot;,&quot;maxLength_98&quot;:&quot;Your&nbsp;input&nbsp;shall&nbsp;not&nbsp;be&nbsp;more&nbsp;than&nbsp;%len&nbsp;characters&quot;,&quot;clearConditions_78&quot;:&quot;clear condition&quot;}">
  <div class="ptishiCon">
    <div class="pl_toast">
      <span class="pl_toast_con"><span>%{tishi_zhanwei}%</span></span>
    </div>
    <!--
%{tishi_zhanwei}%为变量,不可删除
样式名pl_toast最外层容器不可删除
-->
  </div>
</form>

Text Content

 * Home

 * Products
   
    * Workover rig
   
    * Rig
   
    * Cementing equipment
   
    * Solid control equipment
   
    * Well electrical equipment
   
    * Well control equipment
   
    * Oil accessories

 * About Us
   
    * Company Profile
   
    * Culture
   
    * Honor
   
    * Factory

 * Cases
   
    * Company performance
   
    * Typical case

 * News
   
    * Company News
   
    * Industry dynamics

 * Service
   
    * Message
   
    * FAQ

 * Contact Us



中文

English

Русский

Puyang Wanglian Machinery Equipment Co., Ltd
MORE +
Puyang Wanglian Machinery Equipment Co., Ltd
MORE +
Puyang Wanglian Machinery Equipment Co., Ltd
MORE +
Puyang Wanglian Machinery Equipment Co., Ltd
MORE +



scroll down

Products

--------------------------------------------------------------------------------

Workover rig Rig Cementing equipment Oil accessories

Model XJ900(XJ350) vehicle-mounted workover rig

It is mainly used for operations such as well depth ≤ 4000m, workover of oil and
water wells, drilling of oil, water wells and coalbed methane wells, deepening
drilling in casing of production oil wells, and opening window logging.

XJ1350(XJ550) Vehicle-mounted workover rig

XJ1350(XJ550) workover rig is a vehicle-mounted workover equipment with a
maximum hook load of 1350KN, a derrick height of 33m, a workover depth of
7000m(73mmEUE), a nominal overhaul depth of 5500m(3-1/2 drill pipe) and a
drilling depth of 2000m(114mm drill pipe).

XJ1600(XJ650) vehicle mounted workover rig

XJ1600(XJ650) workover rig is a vehicle-mounted workover equipment with a
maximum hook load of 1580KN, a derrick height of 34m, a workover depth of
8500m(73mmEUE), a nominal overhaul depth of 5500m(3-1/2 drill pipe), and a
drilling depth of 2500m(114mm drill pipe).

XJ1800(XJ750) vehicle-mounted workover rig

XJ1800(XJ750) workover truck is a vehicle-mounted drilling and workover rig with
a maximum hook load of 1800KN, a derrick height of 36m and a workover depth of
38m 8000 m27/8 drill pipe, a nominal overhaul depth of 6500m(3-1/2 drill pipe)
and a drilling depth of 3000m(114mm drill pipe).


ZJ40/XJ2250 truck mounted drilling rig

ZJ40/XJ2250 truck-mounted drilling rig is special equipment for oil mines, with
hook load of 2250KN, derrick height of 38m, workover depth of 9000m 2 7/8 drill
pipe nominal overhaul depth of 7500m(3-1/2 drill pipe). Drilling depth 4000((4
1/2 ").

ZJ15/XJ1350 truck mounted drilling rig

ZJ15/XJ1350 truck-mounted drilling rig is a truck-mounted drilling equipment
with a hook load of 1350KN, a derrick height of 33m, a workover depth of
6000m(73mmEUE) and a drilling depth of 1500m(4 1/2 "DP). It is mainly used for
well depth ≤ 6000m, workover of oil and water wells, drilling of oil and water
wells, coalbed methane wells, deepening drilling in casing of production oil
wells, opening window logging and other operations.

ZJ30/1800CZ truck mounted drilling rig

ZJ30/XJ1800 truck-mounted drilling rig is a 3000-meter truck-mounted drilling
rig independently developed by our company. It adopts a dual-engine
parallel-vehicle power system. The gear parallel-vehicle can realize power
switching between vehicle driving and drilling operation, and either engine is
single or parallel-vehicle working.

ZJ20/XJ1580 truck mounted drilling rig

ZJ20/XJ1580 vehicle-mounted drilling equipment, hook load 1580KN, derrick height
34m, workover depth 7000m(73mmEUE), nominal overhaul depth 5800m(3-1/2 drill
pipe). Drilling depth 2000m((4 1/2 "DP)).


Single cementing machine

Features of single cementing machine: all-weather oilfield cementing equipment
can meet the needs of different operation areas such as land, sea and desert,
and adapt to harsh environments such as extreme cold and extreme heat; AMS
dual-variable intelligent and electronically controlled slurry mixing system,
with precise density control, leads the forefront of cementing mixing
technology;

Double cementing machine

Cementing dual machine features: all-weather oilfield cementing equipment to
meet the needs of different operating areas such as land, sea and desert, and
adapt to harsh environments such as extreme cold and extreme heat.


Crown block

The design and manufacture of the series crane conforms to API Spect 4F and 8A
specifications, and has the right to use the API logo.

Mast

The derrick type is generally divided into A type, K type (front opening type),
tower type and mast type, etc.

Drawworks of workover rig

Drawworks of workover rig

Swivel

Conform to API 8A specification and have the right to use API logo

1997 year

Founded in 1997

30 million yuan

Registered capital of 30 million yuan

60000 ㎡

Covering an area of 60000 ㎡

200 sets

More than 200 sets of production equipment



About Wanglian

--------------------------------------------------------------------------------

Puyang WangIan Machinery Eouipment Co., Ltd.

The company is located in Lidong Industrial Agglomeration District, Liyang City,
Henan Province. It was founded in 1997, has a registered capital of 30 million
yuan, covers an area of 60,000 square meters, a construction area of 30,000
square meters, 300 employees, 200 production equipment, 4 postdoctoral staff,
Nine graduate students have independent postdoctoral workstations and
engineering technology research and development centers. The company is an
innovative technology enterprise that produces petroleum drilling equipment and
workover equipment.Complete quality management system, obtained ISO9001, API
dual certification and EU CE certification, and passed the "HSE Management
System Certification of Health, Safety and Environment" of PetroChina and
Sinopec.

View Details

Company Profile

Culture

Honor

Factory



Customer Case

--------------------------------------------------------------------------------

Egypt Services

Egypt Services

More >>

Albania Technical Services

Albania Technical Services

More >>

Azerbaijan

Azerbaijan

More >>

Kazakhstan

Kazakhstan

More >>


All Cases

News

--------------------------------------------------------------------------------

09

2023-12

Trailer Hanging Daily How to Maintain

Regularly check whether the oil tank of each oil is sufficient. If it is
insufficient, it needs to be added in time. Whether the gear oil of each reducer
is sufficient and not too little. Check whether the main and auxiliary wire
ropes are broken, whether the connection is safe, reliable and intact, and
whether the rope press is firm enough.

02

2022-12

Common sense of daily maintenance of drilling mud pump

People will protect themselves and their relatives around them well, will often
greet each other, and ask each other to pay more attention to their bodies. The
body is the capital of the revolution. In fact, the same is true for the goods
and machinery I use. I also need to get people. attention and protection. Just
like the drilling mud pump, if it is not maintained frequently, it will
malfunction and affect the work efficiency. During the daily maintenance of the
drilling mud pump, the pump shall be carefully checked for any abnormality,
whether there is any fault or not. First, take a look at whether the pressure,
flow rate, temperature, current and voltage instigated by various instruments
are normal, and the pump's Whether each part is deformed, discolored, deformed,
leaked, infarction, etc. Then it is to smell whether there is any peculiar
smell, liquid hydrocarbon, gasoline, benzene and other leaked smell, and to
equip paint, rubber and other insulating burnt paste. Taste, etc.; Then listen
to the rolling local sound, whether there is any abnormal sound; Then feel for
overheating, vibration, etc. Only in this way can we do our daily work well and
find abnormal phenomena at an early stage. If the drilling mud pump can operate
normally for a long time and increase its service life, it is necessary to do a
good job of daily inspection and protection, and to check regularly. If abnormal
phenomena in machinery are not detected, it will affect the work. work, bring
trouble, so daily inspection can not be ignored.

31

2022-10

Pay attention to daily maintenance when using the drilling rig

As a mechanized thing, the drilling rig can also be regarded as a consumable.
Then we should pay attention to maintenance before, during and after use The
problem. Like the same car, the better the maintenance, then from the
performance, life and other aspects will be rewarded! We need to make regular
checks in the following areas. 1, the main structure of the drilling rig,
structural connector bolts, structural parts connecting pin shaft, the welding
seam of each structural part, hanging basket structure and safety prevention The
protection condition shall be checked, especially before entering the site for
use, and shall be qualified. The unit of its safety performance testing,
qualified rear can be used; 2. Regularly check the status of various power
heads, working cylinders and drill pipes; 3. Regularly check the hoist drum
anti-wire rope falling device and the height of the edges on both sides, the
condition of the drum wall and the tail of the wire rope on the drum Check the
number of weeks, especially the condition of the brake port should be key items
at any time. Check; 4. Inspection of electrical system, the main inspection
items are: Electric box setting, short circuit protection and leakage protection
device, emergency power-off switch, electric box damping device, cable fixing on
working device, lighting circuit, connection The ground wire must not be used as
current-carrying zero line; 2. in the following areas we should always be
checking 1. Check the consolidation of the wire rope end; The contents of the
wire rope inspection are: the number of safety turns of the wire rope and the
selection of the wire rope Installation, lubrication, Defect inspection of wire
rope, such as wire rope diameter and wear, number of broken wires of wire rope,
etc; 2. Check the pulley system of the drilling rig at any time. The main
inspection items are: the condition of the pulley body and the anti-skipping
rope device of the transition pulley; 3. Check the walking system of the
drilling rig at any time. The main inspection items are: pile crane walking
pipe, clamping plate and hook pipe system status, sleeper paving and so on; 3.
do a good job of drilling rig maintenance records, the replacement of spare
parts should have detailed records, to ensure that spare parts in the validity
period of use, or. Time to grasp the time of the next replacement; 4. the
drilling rig is found to be faulty, the operation shall be stopped immediately
and shall not be used until the fault is eliminated.



Contact Us

Tel:+86-393-8631595 / +86-15039359868

E-mail:admin@wanglianjt.cn

North 200 Meters West of the Intersection of Xindong Road and Gaoyang Avenue,
Hualong District, Puyang City, Henan Province




 * Home

 * Products
   
   * Workover rig
   
   * Rig
   
   * Cementing equipment
   
   * Solid control equipment
   
   * Well electrical equipment
   
   * Well control equipment
   
   * Oil accessories

 * About Us
   
   * Company Profile
   
   * Culture
   
   * Honor
   
   * Factory

 * Cases
   
   * Company performance
   
   * Typical case

 * News
   
   * Company News
   
   * Industry dynamics

 * Service
   
   * Message
   
   * FAQ

 * Contact Us

Message





Confirm
%{tishi_zhanwei}%

Copyright© Puyang Wanglian Machinery Equipment Co., Ltd

Business LicenseSEO

Powered by :www.300.cn   Supported IPV6



Whatsapp:+86-15039359868

E-mail:admin@wanglianjt.cn



Tel:+86-393-8631595

Mobile:+86-15039359868





SAF COOLEST V1.3.1.2 设置面板NQISD-ZDTD-JAAEE-ZQS

营业执照及SEO链接: Business License


无数据提示

Sorry, the current column is being updated, please look forward to it!

You can view other columns or returnHome Page




V1.3.1 SVG图标库请自行添加图标,用DIV包起来,并命名使用



© SAF-Team 版权所有

盗用有风险,使用需谨慎,加入SAF获取更多技术支持

×