www.gekkoindustries.net Open in urlscan Pro
203.78.109.151  Public Scan

Submitted URL: http://www.gekkoindustries.net/english/product-pid.html
Effective URL: https://www.gekkoindustries.net/english/product-pid.html
Submission: On September 04 via api from US — Scanned from DE

Form analysis 0 forms found in the DOM

Text Content

 * (+662)874-1211
 * info@gekkoindustries.net

Thai ENG
 * Home (current)
 * About Us
 * Products
 * Projects
 * Blog
 * Contacts


OUR PRODUCTS

PRE-INSULATED PIPE PRE-INSULATED DUCT PPR PIPE

Gekko Pre-insulated Duct (PID) comes with a range of different facing materials
suitable for different applications; they are manufactured under our stringent
quality control conditions. It is suitable for heating and air-conditioning air
distribution, hot air process system with media temperature ranging between -150
deg. C to +140 deg. C in any environmental conditions.

It offers a high efficiency thermal insulation coupled with the ultimate vapor
barrier facing materials forming a homogeneous composite panel. This kind of new
ductwork material complied with today’s stringent green building requirements.
It is sustainable, anti-corrosion, anti-bacteria, light weight and easy
installation. The Gekko PID system has many advantages over the traditional
sheet metal ducting with fiber glass/elastomeric insulation. It is available in
the facing material of your choice depending on the type of project budget and
application.

(a) Double sided aluminium foil facing
(b) Single sided aluminium foil and galvanized steel sheet on the other side
(c) Single sided aluminium foil and color steel sheet on the other side
(d) Double sided galvanized steel sheet facing
(e) Double sided color steel sheet facing


TECHNOLOGY THAT IMPROVE OUR WELL BEING AND CONSTRUCTION EFFICIENCY

Phenolic foam (PF) is a high technology material commonly used in aerospace
industry due to its excellent insulation, strength, as well as fire prevention
properties.

Gekko has developed Pre-insulated duct (PID) system by using CFC/HCFC free
phenolic foam panel and the various installation accessories.

Our phenolic foam material is specially formulated for the continuous PID penal
production process. This kind of ducting system is easy to install, required
lesser time and manpower as compared to the traditional sheet metal ducting
system. It is also produced lesser noise and dusts during the installation
process which will in turn improve the well-being of the site installers and
construction environment.

www.easyairduct.com


SYSTEM & MATERIAL PROPERTIES

 * LOW THERMAL CONDUCTIVITY AND COEFFICIENT OF EXPANSION

   

 * AIR TIGHT SEAL

   

 * ULTIMATE VAPOUR BARRIER

   

 * GOOD SOUND ATTENUATION

   

 * LESSER WEIGHT

   

 * THERMAL STABILITY

   

 * EASY AND FAST, COST SAVING INSTALLATION

   

 * ENERGY SAVING

   

 * BETTER HYGIENE AND AIR QUALITY

   

 * SILENT OPERATION

   

 * LONG LASTING AND DURABLE

   

 * MECHANICALLY STRONG (UP TO 250 KPA)

   

 * ENVIRONMENT FRIENDLY

   

 * BEST FIRE BEHAVIOR

   


CONTACT

MON-FRI
08:00 - 17:00

Facebook Line@

CALL US


QUOTATION

Tell us your information

Name Contact ex. E-mail, Tel. Company Name Project Name BOQ (Quantity, Area
Estimate)

E-MAIL


PROJECT

ABOVE GROUND 2010

Assumption Rama2

ABOVE GROUND Retrofitting 2008

Bangkok Bank

ABOVE GROUND Retrofitting 2011

Bangkok Hospital

Retrofitting ABOVE GROUND 2012

Central World (Job8712)

Retrofitting ABOVE GROUND 2010

Central World

ABOVE GROUND 2009

Dow

ABOVE GROUND Retrofitting 2009

Dreamworld

Retrofitting ABOVE GROUND 2010

GaySorn Plaza

Retrofitting ABOVE GROUND 2010

Hoya

ABOVE GROUND 2016

Icon Siam

ABOVE GROUND 2007

Inno Value

ABOVE GROUND 2008

Inter Continental HuaHin

ABOVE GROUND 2009

ISB international School

Retrofitting ABOVE GROUND 2009

Kasemrach

ABOVE GROUND 2008

Lotus Salaya

ABOVE GROUND 2008

Minor Factory

Retrofitting ABOVE GROUND 2007

Nestle

ABOVE GROUND 2007

Nidec copal

ABOVE GROUND 2008

Queen's Library

Retrofitting ABOVE GROUND 2011

Saraburi Homemart

ABOVE GROUND 2011

SCB data center

Retrofitting ABOVE GROUND 2006

Thai Airways Kitchen

Retrofitting ABOVE GROUND 2011

ThaNooLuck LumPoon

Retrofitting ABOVE GROUND 2008

Toray

Installation for VRV 2009

Tri Mitr Temple

Hot Water 2009

Park Nai Lerd

Previous Next

GET IN TOUCH

 * 50 Puthabucha Road, Bangmod, Jomthong, Bangkok 10150 Thailand
 * (+662)874-1211
 * info@gekkoindustries.net
 * www.facebook.com/GEKKOsmartPreinsulatedProducts
 * @Gekko

QUICK FEEDBACK

We are happy to hear about our services. If you want to send us feedback via
email Please click the button send feedback
Send feedback
 * Home (current)
 * About Us
 * Products
 * Projects
   
 * Contacts