app.smartsheet.com
Open in
urlscan Pro
44.195.142.5
Public Scan
URL:
https://app.smartsheet.com/b/publish?EQBCT=9ee290661ae34b58851e704ad5db841e
Submission: On August 24 via api from US — Scanned from DE
Submission: On August 24 via api from US — Scanned from DE
Form analysis
0 forms found in the DOMText Content
ROSS Stores Summary Dashboard (View Only) Report Abuse Help An error has occurred in Smartsheet Please log out and log back into the app before continuing. If the problem continues, please request assistance at www.smartsheet.com/gethelp. * Home * Search * Recently Opened * Favorites * Solution Center * Help Grid View Filter Arial 10 toolbar/align left toolbar/conditional formatting highlight changes Press Enter to inspect this widget. Press Enter to inspect this widget. ROSS Stores Summary Dashboard Ross Status of Scope, Schedule & Budget * Project Domain Scope, Schedule & Budget. * Scope * Schedule * Budget Press Enter to inspect this widget. Press Space to open the data source in the same tab. Site T-Minus Details - Click to Open Ross Stores Site T-Minus Press Enter to inspect this widget. Click to Open Ross Stores Contacts Press Enter to inspect this widget. Click to Open Ross Stores Team Vacation Planner Press Enter to inspect this widget. Ross Site Count Report Project NameProject StatusStatus Notes Total Count 27 Project Status Complete Count 4 Baltimore Crossdocks Complete- Approved by Jim via email on 6/12 SEDC H2 Complete- Deliverable document submitted 7/26 - Close out meeting 8/17 SEDC H6 Complete- Deliverable document submitted 7/17 - Closeout meeting 8/17 CVDC Predictive Design Complete- Closeout meeting held on 7/12 - Deliver updated predictive - 7/25 (Updates to Naming/Numbering updates) Project Status In Progress Count 6 Sacramento Crossdocks In Progress- Deliverable document submitted 7/30 - Closeout meeting - Target 8/24 SEDC Aruba Deployment In Progress- Clearpass upgraded, ctrls installed and connected to network; Outdoor APs staged (29); and 65 Indoor APs patched & names assigned. - Next Steps: Add to domain, FW Rules, Add to Cluster and AP Provisioning SEDC Carpeted Space In Progress- Ross to validate Prod Internet Access - 8/22 Corp Campus Wi Fi Refresh In Progress- Project is AMBER - Insight Wireless & Clearpass configs complete. - Limited testing performed with 1 AP DEV Next steps: 1. Ross - Controller move - Date is 8/23 2. Ross - Vlan trunking and DHCP Helpers 3. Ross - License Keys for Wireless and Clearpass (DEV & PROD 4. Insight/Ross - Testing (Mobile, TACACS, etc.) 5. Insight Documentation DEV LLD and Prod HLD Retail Wireless Pilot Move to Managed Services In Progress- Contact: Brian Millington, PM - Status meeting: Friday's 10:00 AM PT https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWQ0ZDY1ZmItNDBiYS00MDE2LWE0MTYtZGQ5ODk5NTQ4MjZk%40thread.v2/0?context=%7b%22Tid%22%3a%226c637512-c417-4e78-9d62-b61258e4b619%22%2c%22Oid%22%3a%22ae6f6eab-9d7b-4128-a11a-2d841063db12%22%7d MVDC Wireless Survey In Progress- Project K/O held on 8/16 - Site survey performed on 8/19 - 8/20 Next Steps 1. Ross - Supply AGV design specs and parameters 2. Wireless verification document - eta 8/31 Project Status Not Started Count 14 CVDC Deployment Not Started- SOW submitted to Ross on 7/27 - Insight update in progress as of 7/31 SEH3 New WLAN for Android Not Started- Pending Ross Review & Approval Supply Chain ClearPass Captive Portal Not Started- Pending Ross Review & Approval ClearPass Migration (SC) Not Started- Pending Ross Review & Approval Predictive surveys San Antonio/El Paso Not Started- Pending Ross Review & Approval Airwave / Airglass Upgrade Not Started- Pending Ross Review & Approval BBO Network Refresh Not Started- PSE Pending Ross Review & Approval Columbus Predictive survey Not Started- Pending Ross Review & Approval DC8 (AZDC) Deployment 2023 Phase 1 Not Started- Pending Ross Review & Approval DC8 (AZDC) Deployment 2023 Phase 2 Not Started- Pending Ross Review & Approval SERVICES - Retail Refresh Pilot 6_23 Not Started- Pending Ross Review & Approval SERVICES - Retail Refresh Pilot 7_23 Not Started- SOW submitted to Ross on 7/28 Tampa Crossdocks: Vulnerability Remediation Not Started- SOW Rewrite In Progress Dublin Managed Services Not Started- Pending Ross Review & Approval Project Status On Hold Count 3 HTDC On Hold- Delayed due to electrical issues. - Per Jim, the new target resolution is TBD Atlanta Crossdocks On Hold- AP Install by Ross - Target eta August Portland Crossdocks On Hold- AP Install by Ross - Target eta August - Open Items: Switch reconfigs and IP Addresses Open source report to view more Press Enter to inspect this widget. Press Space to open the data source in the same tab. Ross Project Status Pie Chart Report Press Enter to inspect this widget. Press Space to open the data source in the same tab. Ross Stores Detailed Active Task Status Report Site NameResources /Site PriorityProject StatusStatus Notes HTDC - Delayed due to electrical issues. - Per Jim, the new target resolution is TBD AP Provisioning Insight HTDC Verification Survey Steven Saylor Deliverable Documentation Insight Sacramento Crossdocks - Deliverable document submitted 7/30 - Closeout meeting - Target 8/24 Atlanta Crossdocks - AP Install by Ross - Target eta August Install new APs (8) RossPer jim, target is eom July/early August Atlanta Wireless Verification Insight Project Deliverables (As built, iGRC) documentation Insight Insight Delivered MS CR (if variance from predictive) Insight Client Approves LLD Design Ross Request to remove Extreme from Insight management Ross Project Close Insight Portland Crossdocks - AP Install by Ross - Target eta August - Open Items: Switch reconfigs and IP Addresses Install new APs (5) Ross Portland Perform Wireless Verification Insight Final Docs and Review Insight Implement Licensing/Hardware/COs Ross Implementation Insight Insight Operational Validation Insight/Ross Ross Testing Ross Insight Managed Services Moved to Production (billing and support commence) Insight/RossSwitches & Gateways added. *APs pending host names Ross iGRC Approval Ross Client Approves LLD Design Ross Request to remove Extreme from Insight management Ross Project Close Insight SEDC Aruba Deployment - Clearpass upgraded, ctrls installed and connected to network; Outdoor APs staged (29); and 65 Indoor APs patched & names assigned. - Next Steps: Add to domain, FW Rules, Add to Cluster and AP Provisioning Ross Dependencies Hardware Delivery Network Access thru FWs Network Delivery Licenses COs for FW, IPs, DHCP, etc. Ross Designs Cabling and AP Install Devices specified and Tested. RossIn Progress, eta 8/1 Planning and Design Ross/Insight HLD Design to Ross Ross/Insight Ross iGRC Approval Ross Client Approves HLD Ross Insight Delivered MS CR (if variance from predictive) Implementation Ross Insight Operational Validation Insigh Insight Managed Services Moved to Production (billing and support commence) Insight/RossProjected timeframe to begin monitoring is mid/eom August Post RF Survey Delivery Insight RF Survey Final Approval Ross Post Implementation Changes Ross Delivery LLD Insight Ross iGRC Approval Ross Client Approves LLD Design Ross Project Close Insight/Ross SEDC Carpeted Space - Ross to validate Prod Internet Access - 8/22 Production Validation RossPer Frank, DHCP and FW changes will be implemented the weekend of 8/21 Project Close Insight Corp Campus Wi Fi Refresh - Project is AMBER - Insight Wireless & Clearpass configs complete. - Limited testing performed with 1 AP DEV Next steps: 1. Ross - Controller move - Date is 8/23 2. Ross - Vlan trunking and DHCP Helpers 3. Ross - License Keys for Wireless and Clearpass (DEV & PROD 4. Insight/Ross - Testing (Mobile, TACACS, etc.) 5. Insight Documentation DEV LLD and Prod HLD Submit/Implement FW Rules for Access RossOngoing Validate Access InsightOngoing Review Ross design and requirements document Insight/RossEngineering kickoff scheduled for 6/14 Dev - Prepare Aruba HLD document InsightSubmitted on 6/29 Dev - Prepare Clearpass HLD document InsightDraft submitted on 7/17 Client Approved HLD Documents Ross7/12 -Kyle approved Wi-Fi Design Configure Aruba devices in DEV InsightIn Progress Configure Clearpass devices in DEV InsightIssue - Unable to upgrade Dbln Clearpass device. 7/13 - Dave S. to begin publisher configs Documentation changes Insight/Ross Submit CO for prod changes Ross Change Order Approval Ross Prod - Configure Aruba devices Insight Prod - Configure Clearpass devices Insight Prod - Wireless LLD Insight Prod - Clearpass LLD Insight Wireless Verification & Clearpass Testing Ross Managed Svcs Onboarding (Insight Delivered MS CR (if variance from predictive) Ross Signed CR and PO Ross Implement Licensing/Hardware/COs Ross Implementation Insight/Ross Insight Operational Validation Insight/Ross Ross Testing Ross Insight Managed Services Moved to Production (billing and support commence) Insight Post RF Survey Delivery Insight RF Survey Final Approval Ross Post Implementation Changes Insight/Ross Delivery LLD Insight Ross iGRC Approval Ross Client Approves LLD Design Ross Project Close Insight/Ross CVDC CVDC Deployment - SOW submitted to Ross on 7/27 - Insight update in progress as of 7/31 Ross Signed SOW and PO Ross Ross Orders Equipment Based off of Project Deliverable Ross Submit Order Placed for BOM, Software, and Licensing Ross Scheduled Start Date Insight Project Engineers Assigned Insight Project Kickoff Insight/Ross Obtain VDI/VPN Access for Insight Engineer if needed Ross Ross Dependencies Tasks: Hardware Delivery Network Access thru FWs Network Delivery Licenses COs for FW, IPs, DHCP, etc. Ross Designs Cabling and AP Install Devices specified and Tested. Ross Planning and Design Insight/Ross HLD Design to Ross Insight Ross iGRC Approval Ross Client Approves HLD Ross Add To Managed Services CR Scoping (preliminary qty based on predictive) Insight CVDC Managed Svcs Onboarding Ross Signed CR and PO Implement Licensing/Hardware/COs Implementation Insight Operational Validation Ross Testing Insight Managed Services Moved to Production (billing and support commence) Post RF Survey Delivery RF Survey Final Approval Post Implementation Changes Delivery LLD Ross iGRC Approval Client Approves LLD Design Project Close Retail Wireless Pilot Move to Managed Services - Contact: Brian Millington, PM - Status meeting: Friday's 10:00 AM PT https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWQ0ZDY1ZmItNDBiYS00MDE2LWE0MTYtZGQ5ODk5NTQ4MjZk%40thread.v2/0?context=%7b%22Tid%22%3a%226c637512-c417-4e78-9d62-b61258e4b619%22%2c%22Oid%22%3a%22ae6f6eab-9d7b-4128-a11a-2d841063db12%22%7d In Progress SEH3 New WLAN for Android - Pending Ross Review & Approval Ross Signed SOW and PO Ross Supply Chain ClearPass Captive Portal - Pending Ross Review & Approval Ross Signed SOW and PO Ross ClearPass Migration (SC) - Pending Ross Review & Approval Ross Signed SOW and PO Ross MVDC Wireless Survey - Project K/O held on 8/16 - Site survey performed on 8/19 - 8/20 Next Steps 1. Ross - Supply AGV design specs and parameters 2. Wireless verification document - eta 8/31 Submit Predictive design to Ross Insight Client Approves Design Ross Predictive SOW Close Insight/Ross Predictive surveys San Antonio/El Paso - Pending Ross Review & Approval Ross Signed SOW and PO Ross Airwave / Airglass Upgrade - Pending Ross Review & Approval Ross Signed SOW and PO Ross BBO Network Refresh - PSE Pending Ross Review & Approval Ross Signed SOW and PO Ross Columbus Predictive survey - Pending Ross Review & Approval Ross Signed SOW and PO Ross DC8 (AZDC) Deployment 2023 Phase 1 - Pending Ross Review & Approval Ross Signed SOW and PO Ross DC8 (AZDC) Deployment 2023 Phase 2 - Pending Ross Review & Approval Ross Signed SOW and PO Ross SERVICES - Retail Refresh Pilot 6_23 - Pending Ross Review & Approval Ross Signed SOW and PO Ross SERVICES - Retail Refresh Pilot 7_23 - SOW submitted to Ross on 7/28 Ross Signed SOW and PO Ross Tampa Crossdocks: Vulnerability Remediation - SOW Rewrite In Progress Insight Delivered Provided SOW Insight Ross Signed SOW and PO Ross Dublin Managed Services - Pending Ross Review & Approval Ross Signed SOW and PO Ross Open source report to view more Press Enter to inspect this widget. Press Space to open the linked Smartsheet item in the same tab. Ross High Level Milestones Report End DateStatus% CompleteMilestoneCommentsResponsible 03/31/23 Atlanta - Wireless Configuration Steve 04/14/23 Atlanta - Go Live Steve 04/21/23 Portland - Wireless Configuration Steve 04/21/23 Portland - Predictive Complete Steve 05/04/23 Atlanta - Insight Predictive Design Complete Steve 05/19/23 Portland Go Live Jim 05/26/23 Atlanta - Install Replacement Switches Rescheduled 5/13 install due to missing componentsSteve 05/26/23 Atlanta - Wireless Verification Confirmed w/ Jim on 5/22Steve 06/04/23 SEDC Carpeted Space Role/Policy Configs Awaiting Ross verification of FW changes for prod internet accessDivya, Dave 06/27/23 CVDC Predictive Survey Design Submitted & ApprovedSteve 07/05/23 Atlanta - Predictive Approved Approved 7/6Jim 07/05/23 Portland - Predictive Approved Approved 7/6Jim 07/05/23 SEDC H6 - Wireless Configuration Steve 07/26/23 SEDC H2 - Wireless Configs Steve 07/31/23 Sacramento Cross docks Steve 09/08/23 MVDC Wireless Survey 09/30/23 Corp Campus DEV Configuration Complete Ben, Divya, Steve, Dave TBD Portland - Addt'l AP Installs and Switch Restack Target Resume Date Mid-AugJim, Steve TBD Portland - Wireless Verification Jim, Steve TBD Atlanta AP Install (7) Target Resume Date Mid-AugJim, Steve TBD Atlanta Wireless Verification Jim, Steve TBD Corp Campus Prod Configuration Complete Ben, Divya, Steve, Dave Open source report to view more Press Enter to inspect this widget. Press Space to open the linked Smartsheet item in the same tab. Ross Accomplishments (Week/Week) Report Week EndingAccomplishmentsParty Members 07/31/23 Sacramento Wireless Verification delivered to Ross 07/26/23 SEDC H2 Wireless Verification delivered to Ross 07/17/23 SEDC H6 Wireless Verification delivered to Ross 06/26/23 CVDC Predictive delivered to Ross 06/16/23 SEDC Carpeted Space LLD delivered to Ross 06/09/23 CVDC Site Visit completed 06/06/23 H6 Site Visit and Wireless Verification Completed 06/04/23 SEDC Carpeted Space Role & Policy Enforcement Implemented (H6) 05/26/23 Atlanta Replacement Switch Install 05/16/23 SEDC Carpeted Space - Role creation and policy enforcement in DEV 05/05/23 Atlanta predictive completed 04/30/23 HTDC APs provisioned 04/21/23 SEDC Carpeted Space kickoff 04/21/23 Portland Crossdocks gateways installed and configured 04/21/23 Portland Crossdocks Predictive Design Corp Campus Non-Prod Clearpass & Wireless Configuration Corp Campus Prod Clearpass & Wireless Configuration MVDC Site Survey Complete MVDC RF Survey delivered to Ross Open source report to view more Press Enter to inspect this widget. Press Space to open the linked Smartsheet item in the same tab. RAID (See below) Press Enter to inspect this widget. Ross Open Action Items/Tasks Report Target Completion DateCategoryResponsibleTask DescriptionStatusCompletion DateNotesTracking 08/16/23Jim Mattison Kansas - Acess point KMO-AP006 appears to be off-line due to the fact of either a bad cable or the cable is connected to the Eth1 port of the AP. OpenAction Item 08/16/23Jim Mattison Kansas - Access point KMO-AP11 appears to be DOA after working with Aruba TAC, a replacement AP was ordered and on-site to be replaced. OpenAction Item 08/16/23Jim Mattison Baltimore -There is a need for a power strip to be added to the cabinet of IDF B so that the redundant switch power supply can be connected to power. OpenAction Item 08/16/23Jim Mattison Baltimore - Two fiber patch cables need to be installed in the MDF to the core switch ports 2/1/26-27 to IDF B & C OpenAction Item 08/16/23Jim Mattison Atlanta - The primary Internet circuit needs to be delivered/connected and provisioned. OpenTarget date 9/2/2023.Action Item 08/16/23Jim Mattison Atlanta - Install access points in green need to be installed and provisioned for both in and outside the facility. Once complete a final on-site verification of the wireless coverage will need to be performed. OpenAction Item 08/16/23Jim Mattison Portland - The primary Internet circuit needs to be delivered/connected and provisioned. OpenTarget date 8/19/2023.Action Item 08/16/23Jim Mattison Portland - Wireless in general for Portland needs to be revisited. Below is the end-state deployment for both in and outside access points. Once they are deployed and provisioned a final wireless verification needs to be performed. OpenTarget Date 10/1/2023.Action Item 08/16/23Jim Mattison Portland - Switches in IDF B & C need to be stacked, this will be performed during the wireless verification. OpenAction Item 08/16/23Jim Mattison Sacramento - Swap 4 off brand SFPs in MDF 2/26 – 27 and IDF B 2/26, IDFC 2/26 with Aruba approved SFPs OpenAction Item 08/16/23Jim Mattison Sacramento -Callouts from the final deliverable need address for the wireless, see attachments OpenAction Item 08/24/23Jim Mattison HTDC status of electrical issue resolution. Required to complete the project OpenAction Item Open source report to view more Press Enter to inspect this widget. Press Space to open the linked Smartsheet item in the same tab. Ross Risks/Issues/Dependency Report Date OfTypeProbabilityImpactStatusCategoryResponsibleDescriptionMitigation Plan/Status/Comments 07/24/23HighHighActiveScheduleBen Savage Divya Kamath VLAN conflict: Control plane security, VLAN 1327 not being allowed across the trunk; SNMP Servers/Logging, spanning tree. 8/22 - Move will be performed on 8/23 8/15 - Ross internal move completion eta is 9/1 Open source report to view more Press Enter to inspect this widget. Press Space to open the linked Smartsheet item in the same tab. Ross Decisions Report Decision #DateDecision DetailsDecide BySupported ByApproved By (if needed)Approved Date 3 06/13/23Corp Campus: CR 71918 - Add Guest W-Fi submitted on 6/1TBDSylvia Rhodes 4 06/06/23SEDC: 25 degree tilt. Team discussed and agreed that a tilt will be implemented08/01/2023Frank B., Steve Saylor06/13/23 1 04/17/23HTDC As Built vs. Mesh design approachTBDJames Mattison, Kyle Ward 2 04/17/23Insight to perform predictives for both Atlanta and Portland4/17/2021James Mattison04/17/23 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 Open source report to view more Press Enter to inspect this widget. Press Space to open the linked Smartsheet item in the same tab.