N6 GALWAY CITY RING ROAD



English Gaeilge


N6 GALWAY CITY RING ROAD DOCUMENTS

The decisions of An Bord Pleanála dated 6 December 2021 granting approval for
the N6 Galway City Ring Road have been quashed, and the applications for
approval of the N6 Galway City Ring Road have been remitted to An Bord Pleanála,
such remittal taking effect from the point in time immediately after the
submission of the Inspector’s Report.

In December 2021 An Bord Pleanála approved (with conditions and modifications)
the N6 Galway City Ring Road.  This was welcomed by Galway County Council,
Galway City Council, and Transport Infrastructure Ireland.  Three sets of
proceedings were taken challenging the decisions of An Bord Pleanála approving
the N6 GCRR, and in January 2023 the High Court made final orders in those 3
sets of proceedings quashing the decisions of An Bord Pleanála, and remitting
the applications for approval of the N6 GCRR to An Bord Pleanála, such remittal
taking effect from the point in time immediately after the submission of the
Inspector’s Report.  A Further Information Request is anticipated from An Bord
Pleanála and Galway County Council will respond as thoroughly and quickly as
possible to any such request.  Galway County Council, Galway City Council and
Transport Infrastructure Ireland remain committed to the delivery of the N6 GCRR
and welcomes the opportunity to engage with An Bord Pleanála further on this
project.

Links to the orders made by the High Court:

Order – Friends of the Irish Environment JR

Order – Galway Race Committee JR

Order – Brooks Timber and Building Supplies Ltd JR

 

Inspectors Report ABP-302848-18 and ANP-302885-18 Inspectors Report Appendix 4,
Appendix 5 and Appendix 6 Protected Road Scheme Schedules 4 November 2020
Motorway Scheme Schedules 4 November 2020 Protected Road Scheme Deposit Maps 4
November 2020 Motorway Scheme Deposit Maps 4 November 2020 Schedule of
Environmental Commitments 4 November 2020


 

Link to An Bord Pleanála website – Case reference: HA07.302848 Galway

N6 Galway City Ring Road Proposed Road Development (EIAR/NIS)

https://www.pleanala.ie/en-ie/case/302848

 

Link to An Bord Pleanála website – Case reference: MA07.302885 Galway

N6 Galway City Ring Road Motorway Scheme 2018 and Protected Road Scheme 2018

https://www.pleanala.ie/en-ie/case/302885


 


THE ORAL HEARING FOR THE N6 GCRR CONCLUDED ON WEDNESDAY 4TH NOVEMBER 2020‌

 


ORAL HEARING DOCUMENTS

 * Introduction
 * List of Submissions and Objections
 * Main Brief of Evidence
   * Figure 5.1.14
   * GCOB-D-LB-695-607 I6
   * Figure 5.1.01 to 5.1.15
   * Figure 5.2.01 to 5.2.11
   * Figures 5.3.01 - 5.3.21.
   * Figures 5.4.01 - 5.4.15
   * NUIG Sporting Campus and Parkmore Link Road Drawing List

 * Planning and Policy Context
 * Traffic
 * Biodiversity EIA
 * Biodiversity AA
 * Material Assets - Agriculture
 * Equine
 * Hydrogeology
 * Hydrology
 * Soils and Geology
 * NUIG
 * Population - Human Beings/Socio Economics
 * Irish Language BoE‌
 * Archaeology, Architectural & Cultural Heritage
 * Noise & Vibration
 * ‌ Air Quality & Climate
 * Human Health
 * Landscape & Visual
 * Addendum
 * Corrigendum
   * READ ME
   * GIS Data
 * Additional Environmental Commitments
 * N6 GCRR Motorway Scheme Schedules - Issue 2
 * MS Deposit Maps - Issue 2
 * N6 GCRR Protected Road Scheme Schedules - Issue 2
 * PRS Deposit Maps - Issue 2
 * Legal
 * Response to Queries Raised in Module 1
   * Response to Queries Raised in Module 1 - Appendices
 * Eco-hydrogeology Summary Report Lough Corrib cSAC
 * Eco-hydrogeology Summary Report Moycullen Bogs NHA‌
 * AA - In-combination Assessment Addendum I1
 * EIAR - Cumulative Impact Assessment Addendum I1
 * Hydrogeology - Updated Corrigendum
 * Response to Queries in Module 1 - Barn Owl Habitat
 * Polygon 1f Data
   * 2017 Field Notes relating to Polygon 1f
   * Soil Depth Measurements of Various Transects in Polygon 1f
   * Composite Map of all Relevé Locations in Polygon 1f
 * Schedule of Additional Environmental Commitments (Updated 13 March 2020)
   
 * Archaeological Field Inspection Menlo
 * AA Incombination Assessment Addendum I2
 * EIAR - Cumulative Impact Assessment Addendum I2
 * Response to Queries Raised in Module 2 - Consideration of GCOB
 * Responses to Queries Raised in Module 2 - In Respect of Traffic and Climate
   * ‌Drone Footage Deane Roundabout
   * Drone Footage Briarhill Junction
   * Drone Footage Rahoon Road Seamus Quirke Road Junction
   * Drone Footage Coolagh Roundabout
   * Micro-Simulation Assessment
 * Lackagh Quarry Response
 * Additional Environmental Commitments Updated 20.10.2020
 * Legal Submissions (30 October 2020)
 * Presentation (30 October 2020)
 * Design Development of Galway Racecourse Tunnel
 * Response to Submissions - Kerin
 * AA In-combination Assessment Addendum I3
 * EIAR - Cumulative Impact Assessment Addendum I3
 * Schedule of Environmental Commitments 04.11.2020
 * Schedule of Environmental Commitments 04.11.2020 - Tracked Changes
 * AA In-Combination Assessment of Burkeway Bearna SHD
 * EIAR Cumulative Impact Assessment of Burkeway Bearna SHD
 * N6 GCRR Motorway Scheme Schedules - Issue 3
 * MS Deposit Maps - Issue 3
 * N6 GCRR Protected Road Scheme Schedules - Issue 3
 * PRS Deposit Maps - Issue 3
 * N6 GCRR Motorway Scheme Schedules - Issue 3 - Tracked Changes
 * MS Deposit Maps - Issue 3 - Tracked Changes
 * N6 GCRR Protected Road Scheme Schedules - Issue 3 - Tracked Changes
 * PRS Deposit Maps - Issue 3 - Tracked Changes‌


 


REQUEST FOR FURTHER INFORMATION RESPONSE 30TH AUGUST 2019

 * Request for Further Information Response
 * RFI Response Newspaper Notice 19 Sept 2019
 * RFI Response Newspaper Notice 5 Dec. 2019


NEWSPAPER NOTICE

 * Newspaper Notice 25th Oct 2018


N6 GALWAY CITY RING ROAD MOTORWAY SCHEME 2018 (MS)

 * N6 GCRR MS Sept 2018 - Schedules
 * M‌S Deposit Maps‌


N6 GALWAY CITY RING ROAD PROTECTED ROAD SCHEME 2018 (PRS)

 * N6 GCRR PRS Sept 2018 - Schedules
 * P‌RS Deposit Maps‌


ENVIRONMENTAL IMPACT ASSESSMENT REPORT

 * Volume 1 - Non Technical Summary
 * Volume 2 - Environmental Impact Assessment Report
   
   * N6 EIAR - Chapter 1 Introduction
   * N6 EIAR - Chapter 2 Planning and Policy Context
   * N6 EIAR - Chapter 3 Need for the Proposed Road Development
   * N6 EIAR - Chapter 4 Alternatives Considered
   * N6 EIAR - Chapter 5 Descript of the Proposed Road Development
   * N6 EIAR - Chapter 6 Traffic Assessment and Route Cross-Section
   * N6 EIAR - Chapter 7 Construction Activities
   * N6 EIAR - Chapter 8 Biodiversity
   * N6 EIAR - Chapter 9 Soils and Geology
   * N6 EIAR - Chapter 10 Hydrogeology
   * N6 EIAR - Chapter 11 Hydrology
   * N6 EIAR - Chapter 12 Landscape and Visual
   * N6 EIAR - Chapter 13 Archaeology
   * N6 EIAR - Chapter 14 Material Assets Agriculture
   * N6 EIAR - Chapter 15 Material Assets Non-Agriculture
   * N6 EIAR - Chapter 16 Air Qualtiy and Climate
   * N6 EIAR - Chapter 17 Noise and Vibration
   * N6 EIAR - Chapter 18 Human Beings, Population and Human Healthh
   * N6 EIAR - Chapter 19 Major Accidents, Inter-Relationships, Interactions and
     Cumulative Impacts
   * N6 EIAR - Chapter 20 Summary of Mitigation Measures and Residual Impacts
   * N6 EIAR - Chapter 21 Schedule of Environmental Commitments‌
   * Glossary of Terms
 * Volume 3 - Figures

FiguresVolume 3 1.1 Overall Location Plan 5.1.01 - 5.1.15 Proposed Road
Development Plan Layout 5.2.01 - 5.2.11 Proposed Design Geometry  5.3.01 -
5.3.21 Proposed Road Development Plan & Profile  5.4.01 - 5.4.15 Road Lighting
Columns and Brackets Location 7.001 - 7.002 Proposed Site Compounds & Haul
Routes Overall Plan 7.101 - 7.124 Proposed Site Compounds & Haul Routes 7.201 & 
7.202 Potential Blasting Locations During Construction 7.301 & 7.302 Proposed
Material Deposition Areas 8.1.1 &  8.1.2 Ecological Habitat Survey Site
Locations 8.2.1‌ Rare and or Protected Plant Species Locations 8.3.1 - 8.3.15
Mammal Survey Study Area and Results 8.4.1 & 8.4.2 Bat Surveys Methodology
8.5.1  White - clawed Crayfish, Freshwater pearl mussel and Vertigo species
Surveys 8.6.1 &  8.6.2‌ Marsh Fritillary Survey Sites (2014 and 2015) and
Results (2013, 2014 and 2015) 8.6.3 - 8.6.8 Marsh Fritillary Survey Sites and
Results 8.7.1 - 8.7.15 Breeding Bird Survey Results 8.8.1‌ Barn Owl Survey
Results and Raptor Records 8.9.1 Winter Bird Survey Sites 8.10.1 - 8.10.8
Amphibian & Reptile Survey Sites and Results 8.11.1 Fisheries and Q-Sampling
Survey Sites 8.12.1‌ European Sites within 15km 8.13.1 Nationally Designated
Sites within 15km 8.14.1 - 8.14.15 Habitat Survey Results – Fossitt (2000)
Habitat Classifications 8.15.1 - 8.15.15 Habitat Survey Results – Annex 1
Habitat Types & Invasive Plant Species 8.16.1 - 8.16.15 Bat Survey – Tree Survey
Results 8.17.1  Bat Survey – Buildings Surveyed ‌ 8.18.1 Bat Survey Results –
Lesser Horseshoe Bat 8.19.1 Bat Survey Results – Whiskered Bat, Natterer’s Bat,
Daubenton’s Bat & Leisler ‘s Bat 8.20.1 Bat Survey Results – Brown Long-eared
Bat, Nathusius’ Pipistrelle, Myotis Species 8.21.1 Bat Survey Results –Common
Pipistrelle, Soprano Pipistrelle & Unidentified Pipistrelle Species 8.22.1‌
Static Bat Detector Locations 8.23.1 - 8.23.15 Biodiversity (excluding Bats)
Mitigation

8.24.1 - 8.24.15

Bat Mitigation 9.1.001 &  9.1.002 Quaternary Geology Overview 9.1.101 - 9.1.115
Quaternary Geology Mapping 9.2.001 &  9.2.002‌ Soil Drainage Overview 9.2.101 -
9.2.115 Soil Drainage Mapping 9.3.001 &   9.3.002 National Soils Overview
9.3.101 - 9.3.115 National Soils Mapping 9.4.001 to 9.4.002 Subsoils Geology
Overview 9.4.101 - 9.4.115‌ Subsoils Geology Overview  9.5.001 &  9.5.002 Solid
Geology Overview 9.5.101 - 9.5.115 Solid Geology Mapping 9.6.001 &  9.6.002
Mineral and Aggregate Overview 9.6.101 - 9.6.115‌ Mineral and Aggregate 9.7.001
&  9.7.002 Soft, Unstable, Contaminated & Geological Heritage Overview 9.7.101 -
9.7.115 Soft, Unstable, Contaminated & Geological Heritage Mapping 9.8.001 -
9.8.012 Ground Investigation Plan & Profile 9.9.001 & 9.9.002 Ground
Investigation Overview 10.1.001 & 10.1.002 Bedrock Aquifer Classification (GSI)
with Karst Features 10.2.001 & 10.2.002 Groundwater Bodies (GSI) 10.3.001 & 
10.3.002 Groundwater Vulnerability (GSI) Existing Environment 10.4.001 &
10.4.002 Recharge Coefficient (GSI) Existing Environment 10.5.001 &  10.5.002
Groundwater Receptors 10.6.001 - 10.6.012‌ Hydrogeology Plan & Profile 10.7.101
- 10.7.115 Construction Zone of Influence (ZoI) 10.8.101 - 10.8.115 Operation
Zone of Influence (ZoI) 11.1.001 & 11.1.002 Hydrology Overview - Drainage
Catchments 11.2.001 &  11.2.002 Flood Risk Mapping - Pluvial & Groundwater
Overview 11.2.101 - 11.2.115‌ Flood Risk Mapping - Pluvial & Groundwater
11.3.001 &  11.3.002 Flood Risk Mapping - Fluvial & Coastal Overview 11.3.101 -
11.3.115‌ Flood Risk Mapping - Fluvial & Coastal 11.4.001 &  11.4.002 Flood Risk
Mapping – Galway City Council Flood Zones 11.4.101 - 11.4.115 Flood Risk Mapping
– Galway City Council Flood Zones 11.5.01 - 11.5.02 Proposed Drainage Network
Plan Layout Overall Plan 11.5.101 - 11.5.115 Proposed Road Development Plan
Layout and Drainage Network 11.6.001 Proposed Flood Relief Measures N83 Tuam
Road Junction Plan & Longitudinal Section 12.1.01 - 12.1.15 Landscape and Visual
Potential Impacts and Proposed Mitigation Measures 12.2.01 - 12.2.02 Landscape
and Visual Assessment – Landscape Character Overview 12.3.01 - 12.3.02 Landscape
and Visual Assessment – Landscape Planning Aspect 13.1.01 - 13.1.15 Archaeology,
Architectural & Cultural Heritage 14.1.01 - 14.1.15 Material Assets -
Agriculture and Non-Agriculture 15.1.01 - 15.1.15 Services ESB 38kV & 110kV
15.2.01 - 15.2.05 Services Gas Networks 15.3.01 - 15.3.15 Material Assets
Non-Agriculture Demolitions & Acquisitions 15.4.01 & 15.4.02 Development plan
Zonings 16.1.01 - 16.1.07 Air Quality Receptors Locations 17.1.01 - 17.1.15
Noise Monitoring and Mitigation Locations 18.1.001 & 18.1.002 Human Beings,
Population and Human Health Overview 18.1.101 - 115 Human Beings, Population and
Human Health

 * Volume 4 – Appendices‌

 Appendices  Volume 4    Public Consultation No.1 A.1.1   Public Consultation
No.2 A.1.2   Public Consultation No.3 A 1 3   Tunnel Services Buildings Detail
A.5.1   Phase 3 Traffic Modelling Report A.6.1   A.6.1. Appendix A WRM Road
Model Development Report A.6.1_Appendix A   Phase 3 Design - Cost Benefit
Analysis Report A.6.2   River Corrib Bridge Constructability Examination A.7.1  
Menlough Viaduct Constructability Examination A.7.2   Lackagh Tunnel
Geotechnical and Hydrogeological Appraisal A.7.3   Galway Racecourse Tunnel
Constructability Report A.7.4   Construction Environmental Management Plan A.7.5
  Ecology Field Survey Methodologies A.8.1   Consultation Responses A.8.2  
Galway City Transport Project: Report on the presence of Annex I habitat *7220 
Petrifying springs with tufa formation (O’Neill & Barron, 2015) A.8.3   Galway
City Transport Project - Assessment of Annex I habitats in the Ballygarraun
survey area (Perrin, 2014) A.8.4  

Galway City Transport Project - Habitat mapping and assessment of a section of
Lough Corrib cSAC and surrounding areas (Barron et al., 2017)

A.8.5   Summary of the Fossitt Habitat Classification - from p.14 of A Guide to
Habitats in Ireland (Fossitt, 2000) A.8.6  

Galway Bat Radio-tracking Project - Bat Radio-tracking surveys. Radio-tracking
studies of lesser horseshoe and vesper bat species, August and September 2014
(Rush & Billington, 2014)

A.8.7   Galway City Transport Project - Bat Acoustic Surveys: Summer-Autumn 2014
(Geckoella Ltd., 2015a) A.8.8   N6 Galway City Transport Project - Bat
Radio-tracking and Roost Surveys 19th to 29th August 2014 (Geckoella Ltd.,
2015b) A.8.9   Galway bat radio-tracking project. Radio tracking studies of
lesser horseshoe bat species, May 2015 (Rush & Billington, 2015) A.8.10  

A Survey of Selected Rivers for the Galway City Transport Project with Potential
for Margaritifera (Moorkens, 2014a)

A.8.11   Molluscan Survey Results A.8.12   N6 Galway City Transport Project
Marsh Fritillary Survey Summary Report - 2014 (Woodrow Sustainable Solutions
Ltd., 2015) A.8.13   Marsh Fritillary Survey Report (Barron et al., 2013) A.8.14
  The status of Barn Owls within the study area for the proposed N6 Galway City
Ring Road A.8.15    The occupancy and breeding status of Peregrine falcon in
quarries within the survey area for the proposed N6 Galway City Ring Road 
A.8.16   Fisheries Assessment for the N6 Galway City Transport Project (Triturus
Environmental Services Ltd., 2018) A.8.17   Desk Study A.8.18   Habitat Survey
Results - Species Lists A.8.19   Results of Aquatic Habitat Surveys A.8.20  
Lackagh Quarry Petrifying Spring Survey Results A.8.21   Breeding Bird Survey
Results A.8.22   Wintering Bird Survey Results A.8.23   Badger Sett Mitigation
during Construction A.8.24   Bat Derogation Licence Application A.8.25  
Compensatory Habitat Management Plans A.8.26   Ground Investigation Reports –
Part 1 A.9.1a   Ground Investigation Reports – Part 2 A.9.1b   Ground
Investigation Reports – Part 3 A.9.2c   Well Commissioning Report A.10.1   Karst
Survey Report A.10.2   Water Level Monitoring Database A.10.3   Groundwater
Quality Monitoring Report A.10.4   Aquifer Tests Report A.10.5   Hydraulic
Calculations A.10.6   HD45 Assessment A.10.7   Flood Risk Assessment Study
A.11.1   Water Quality Monitoring of Selected Surface Waters for the N6 Galway
City Ring Road Project A.11.2   Visual Impact Schedule A.12.1   River Corrib
Bridge Photomontages A.12.2  

Photomontages - Key Locations

A.12.3   Archaeological and Historical Background A.13.1   Recorded Monuments
within the Receiving Environment A.13.2   Stray Find from within the Receiving
Environment A.13.3   Protected Structure & NIAH Structures within the Receiving
Environment A.13.4   Detailed Landscapes A.13.5   Detailed Field Inspection
Results A.13.6   Detailed Field Inspection Results Plates A.13.7   Legislative
Framework Protecting the Archaeological Resource A.13.8   Legislative Framework
Protecting the Architectural Resource A.13.9   Impact Assessment and the
Cultural Heritage Resource A.13.10   Mitigation Measures and the Cultural
Heritage Resource A.13.11   Geophysical Survey Report A.13.12   Summary of
Individual Farm Impacts A.14.1   NUIG Sports Facilities Mitigation Proposals
A.15.1   Galway Racecourse Stables Mitigation Proposals A.15.2   110kV Diversion
Details A.15.3   Galway City Ambient Air Quality February - May 2017 A.16.1  
Baseline Noise Survey Results A.17.1   Construction Noise & Vibration Mitigation
A.17.2   Calculated Road Traffic Noise Levels A.17.3   Health Profile 2015
Galway City A.18.1   Health Profile 2015 Galway County A.18.2

 


PROVISION OF INFORMATION FOR APPROPRIATE ASSESSMENT SCREENING

 * ‌ Provision of Information for Appropriate Assessment Screening

 


NATURA IMPACT ASSESSMENT STATEMENT

 * ‌ N6 GCRR - NIS Vol 1 - Exec Summary
 * N6 GCRR - Vol 2 - NIS
 * Volume 3 - Figures

FiguresVolume 3 1.1 - 1.15 Proposed Road Development Plan Layout 2.1 - 2.15
Proposed Road Development Plan Layout and Drainage Network 3.1 - 3.2 Proposed
Site Compounds & Haul Routes Overall Plan 4.1 Ecological Habitat Survey Site
Locations Sheet 1 of 2 4.2 Ecological Habitat Survey Site Locations Sheet 2 of 2
5 Hamatocaulis vernicosus Survey Sites & Results 6 Otter Survey Results 7
White-clawed crayfish Survey Sites 8.1 Breeding Bird Survey Results Sheet 1 of 2
8.2 Breeding Bird Survey Results Sheet 2 of 2 9 Winter Bird Survey Sites 10.1.1
Revised groundwater bodies (2017) and European sites Sheet 1 of 2 10.1.2 Revised
groundwater bodies (2017) and European sites Sheet 2 of 2 10.2.1 Hydrogeological
ZoI (drawdown and potential pollution) Sheet 1 of 2 10.2.2 Hydrogeological ZoI
(drawdown and potential pollution) Sheet 2 of 2 10.3.1 Ross Lake GWB
Construction Hydrogeological premitigation ZoI Sheet 1 of 8 10.3.2 Ross Lake GWB
Operational Hydrogeological premitigation ZoI Sheet 2 of 8 ‌ 10.3.3 GWDTE Lough
Corrib Fen 1 GWB Construction Hydrogeological premitigation ZoI Sheet 3 of 8
10.3.4 GWDTE Lough Corrib Fen 1 GWB Operational Hydrogeological premitigation
ZoI Sheet 4 of 8 10.3.5 GWDTE Lough Corrib Fen 2 GWB Construction
Hydrogeological premitigation ZoI Sheet 5 of 8 10.3.6 GWDTE Lough Corrib Fen 2
GWB Operational Hydrogeological premitigation ZoI Sheet 6 of 8 10.3.7 Clare -
Corrib (Terryland) GWB Construction Hydrogeological premitigation ZoI Sheet 7 of
8 10.3.8 Clare - Corrib (Terryland) GWB Operational Hydrogeological
premitigation ZoI Sheet 8 of 8 11.1 Hydrology Overview – Drainage Catchments
11.2 Hydrology Overview – Drainage Catchments 12 The proposed Road Development
and European Sites 13.1 Habitat Survey Results – Proposed River Corrib Bridge
(Fossitt habitat classifications) 13.2 Habitat Survey Results – Proposed
Drainage Outfall N59 Link Road (Fossitt habitat classifications) ‌ 13.3 Habitat
Survey Results – Menlough/Coolagh Lakes (Fossitt habitat classifications) 13.4
Habitat Survey Results – Lackagh Tunnel (Fossitt habitat classifications) 13.5
Habitat Survey Results – Lackagh Tunnel ‘Insert A’ (Fossitt habitat
Classification) 14.1 Habitat Survey Results – Proposed River Corrib Bridge
(Annex I habitat classifications) 14.2 Habitat Survey Results – Proposed Road
Drainage Outfall – N59 Link Road (Annex I habitat classifications) 14.3 Habitat
Survey Results – Menlough/Coolagh Lakes (Annex I habitat classifications) 14.4
Habitat Survey Results – Lackagh Tunnel (Annex I habitat classifications) ‌ 14.5
Habitat Survey Results – Lackagh Tunnel (Annex I habitat classifications) 15.1
Habitat Area Reference Codes and Retained areas of habitat in Lough Corrib cSAC
15.2 Habitat Area Reference Codes and Retained areas of habitat in Lough Corrib
cSAC 15.3 Habitat Area Reference Codes and Retained habitat areas in Lough
Corrib cSAC 15.4 Habitat Survey Results – Lackagh Tunnel (Annex I habitat
classifications) 15.5 Habitat Survey Results – Lackagh Tunnel (Annex I habitat
classifications) 16 European sites within the Zol of the proposed road
development

 *  Volume 4 - Appendices

NIS Appendix A Hydrogeology NIS Appendix B Hydrology Assessment NIS Appendix C
CEMP NIS Appendix D River Corrib Bridge Construction NIS Appendix E Menlough
Viaduct Construction NIS Appendix F Lackagh Tunnel Geo and Hydro Appraisal NIS
Appendix G Lough Corrib cSAC Habitat Surveys NIS Appendix H Breeding Bird Survey
Results NIS Appendix I Winter Bird Survey Results NIS Appendix J Fisheries
Survey NIS Appendix K Aquatic habitat survey results NIS Appendix L Air Quality
Assessment Report NIS Appendix M Shading Analysis Report NIS Appendix N Sample
Site Specific Conservation Objectives for Lough Corrib SPA NIS Appendix O Plan
Level Environmental Protection Policies

--------------------------------------------------------------------------------