llc-bhd.com
Open in
urlscan Pro
128.199.233.104
Public Scan
URL:
https://llc-bhd.com/popup/dam-hulu.html
Submission: On December 05 via api from US — Scanned from SG
Submission: On December 05 via api from US — Scanned from SG
Form analysis
0 forms found in the DOMText Content
Hulu Terengganu Hydroelectric Project Lot CW2 - Main Civil and Associated Works FACT SHEET Location Hulu Terengganu, Terengganu Owner Tenaga Nasional Berhad Consultant HTJV (SNC-Lavalin Inc, SNC-Lavalin Power (Malaysia) Sdn Bhd Completion Date 18 December 2015 a) Puah Dam Type : Earthfill Dam Height : 70 m Crest Length : 600 m Volume : 8,600,000 cu.m Reservoir Area : 6000 ha b) Puah Dam Spillway Type : Gated spillway with concrete lined chute, flip bucket and plunge pool Concrete Volume : 45,800 cu.m Excavation : 2,300,000 cu.m c) Tembat Dam Type : Concrete gravity dam Height : 28 m Crest Length : 226 m Volume : 55,000 cu.m Reservoir Area : 101 ha d) Power Intake & Power Conduits Diameter : 4.5 m Length : 391 m e) Diversion Tunnel Diameter : 2 x 9.2 m Length : 445 m f) Tembat Water Transfer Tunnel Diameter : 4.5 m Length : 1,250 m g) Tailrace Tunnel Diameter : 8 m Length : 1,220 m h) Others Type : Underground Powerhouse, Generation Control building Capacity : 2 x 125 MW