Hulu Terengganu Hydroelectric Project Lot CW2
- Main Civil and Associated Works
FACT SHEET
Location
Hulu Terengganu, Terengganu
Owner
Tenaga Nasional Berhad
Consultant
HTJV (SNC-Lavalin Inc, SNC-Lavalin Power (Malaysia) Sdn Bhd
Completion Date
18 December 2015
a) Puah Dam

Type : Earthfill Dam Height : 70 m Crest Length : 600 m Volume : 8,600,000 cu.m
Reservoir Area : 6000 ha

b) Puah Dam Spillway

Type : Gated spillway with concrete lined chute, flip bucket and plunge pool
Concrete Volume : 45,800 cu.m Excavation : 2,300,000 cu.m

c) Tembat Dam

Type : Concrete gravity dam Height : 28 m Crest Length : 226 m Volume : 55,000
cu.m Reservoir Area : 101 ha

d) Power Intake & Power Conduits

Diameter : 4.5 m Length : 391 m

e) Diversion Tunnel

Diameter : 2 x 9.2 m Length : 445 m

f) Tembat Water Transfer Tunnel

Diameter : 4.5 m Length : 1,250 m

g) Tailrace Tunnel

Diameter : 8 m Length : 1,220 m

h) Others

Type : Underground Powerhouse, Generation Control building Capacity : 2 x 125 MW