banksiderowville.com.au Open in urlscan Pro
116.90.54.10  Public Scan

Submitted URL: https://www.banksiderowville.com.au/
Effective URL: https://banksiderowville.com.au/
Submission: On August 13 via automatic, source certstream-suspicious — Scanned from AU

Form analysis 1 forms found in the DOM

POST https://oliverhume.tfaforms.net/api_v2/workflow/processor

<form method="post" action="https://oliverhume.tfaforms.net/api_v2/workflow/processor" class="hintsBelow labelsAbove state-setup" id="4727739" role="form">
  <div class="oneField field-container-D" id="tfa_2-D">
    <label id="tfa_2-L" class="label preField reqMark" for="tfa_2">First Name</label><br>
    <div class="inputWrapper">
      <input type="text" id="tfa_2" name="tfa_2" value="" placeholder="First Name" aria-required="true" title="First Name" class="required">
    </div>
  </div>
  <div class="oneField field-container-D" id="tfa_3-D">
    <label id="tfa_3-L" class="label preField reqMark" for="tfa_3">Surname</label><br>
    <div class="inputWrapper">
      <input type="text" id="tfa_3" name="tfa_3" value="" placeholder="Surname" aria-required="true" title="Surname" class="required">
    </div>
  </div>
  <div class="oneField field-container-D    " id="tfa_4-D">
    <label id="tfa_4-L" class="label preField reqMark" for="tfa_4">Email</label><br>
    <div class="inputWrapper">
      <input type="text" id="tfa_4" name="tfa_4" value="" placeholder="Email" aria-required="true" title="Email" class="validate-email required">
    </div>
  </div>
  <div class="oneField field-container-D    " id="tfa_5-D">
    <label id="tfa_5-L" class="label preField reqMark" for="tfa_5">Phone Number</label><br>
    <div class="inputWrapper">
      <input type="text" id="tfa_5" name="tfa_5" value="" placeholder="Phone Number" aria-required="true" title="Phone Number" class="validate-integer required" pattern="\d*">
    </div>
  </div>
  <div class="oneField field-container-D    " id="tfa_13-D">
    <label id="tfa_13-L" class="label preField reqMark" for="tfa_13">Postcode</label><br>
    <div class="inputWrapper">
      <input type="text" id="tfa_13" name="tfa_13" value="" placeholder="Postcode" aria-required="true" title="Postcode" class="required" pattern="\d*">
    </div>
  </div>
  <div class="oneField field-container-D    " id="tfa_59-D">
    <ul class="dropdown">
      <li><a href="#" class="select-option" data-index="0" data-value="">
                                Please select...
                            </a></li>
      <li><a href="#" class="select-option" data-index="1" data-value="tfa_60">
                                Land
                            </a></li>
      <li><a href="#" class="select-option" data-index="2" data-value="tfa_61">
                                Townhouse
                            </a></li>
    </ul><a href="#" class="faux-input">What are you looking for?</a>
    <label id="tfa_59-L" class="label preField " for="tfa_59">What are you looking for?</label><br>
    <div class="inputWrapper">
      <select id="tfa_59" name="tfa_59" title="What are you looking for?" class="">
        <option value=""> Please select... </option>
        <option value="tfa_60" id="tfa_60" class=""> Land </option>
        <option value="tfa_61" id="tfa_61" class=""> Townhouse </option>
      </select>
    </div>
  </div>
  <div class="oneField field-container-D    " id="tfa_74-D" role="group" aria-labelledby="tfa_74-L" data-tfa-labelledby="-L tfa_74-L">
    <div class="inputWrapper">
      <span id="tfa_74" class="choices vertical required">
        <span class="oneChoice">
          <input type="checkbox" value="tfa_75" class="" id="tfa_75" name="tfa_75" aria-labelledby="tfa_75-L" data-tfa-labelledby="tfa_74-L tfa_75-L" data-tfa-parent-id="tfa_74">
          <label class="label postField" id="tfa_75-L" for="tfa_75">I have read and accept the <a target="_blank" href="https://www.oliverhume.com.au/privacy-policy">Privacy Policy</a></label>
        </span>
      </span>
    </div>
  </div>
  <input type="hidden" id="tfa_19" name="tfa_19" value="" class="">
  <input type="hidden" id="tfa_63" name="tfa_63" value="" class="formula=getDefaultValuesString('utm_campaign');">
  <input type="hidden" id="tfa_20" name="tfa_20" value="" class=""><input type="hidden" id="tfa_65" name="tfa_65" value="" class="formula=getDefaultValuesString('utm_medium');">
  <input type="hidden" id="tfa_21" name="tfa_21" value="" class=""><input type="hidden" id="tfa_67" name="tfa_67" value="" class="formula=getDefaultValuesString('utm_source');">
  <input type="hidden" id="tfa_22" name="tfa_22" value="" class="">
  <input type="hidden" id="tfa_69" name="tfa_69" value="" class="formula=getDefaultValuesString('utm_content');">
  <input type="hidden" id="tfa_26" name="tfa_26" value="" class="">
  <input type="hidden" id="tfa_71" name="tfa_71" value="" class="formula=getDefaultValuesString('utm_term');">
  <input type="hidden" id="tfa_52" name="tfa_52" value="" class="">
  <input type="hidden" id="tfa_53" name="tfa_53" value="" class="">
  <input type="hidden" id="tfa_54" name="tfa_54" value="" class="">
  <div class="actions" id="4727739-A" data-contentid="submit_button">
    <input type="submit" data-label="Submit" class="primaryAction" id="submit_button" value="Submit">
  </div>
  <div style="clear:both"></div>
  <input type="hidden" value="4727739" name="tfa_dbFormId" id="tfa_dbFormId">
  <input type="hidden" value="" name="tfa_dbResponseId" id="tfa_dbResponseId">
  <input type="hidden" value="0d0f17ad8555ccfd7cbdad07b6d2af63" name="tfa_dbControl" id="tfa_dbControl">
  <input type="hidden" value="" name="tfa_dbWorkflowSessionUuid" id="tfa_dbWorkflowSessionUuid">
  <input type="hidden" value="" name="tfa_noOverWriteFields" id="tfa_noOverWriteFields">
  <input type="hidden" value="13" name="tfa_dbVersionId" id="tfa_dbVersionId">
  <input type="hidden" value="" name="tfa_switchedoff" id="tfa_switchedoff">
</form>

Text Content

BANKSIDE ROWVILLE




 * Vision
   * Masterplan
   * Amenities
   * Sustainability
 * Location
 * Now Selling
   * Land
   * House And Land
   * Edition Townhomes
 * Title Updates
 * Project Team

Register CALL 03 9684 8103



A VIBRANT NEW COMMUNITY
IN HARMONY WITH NATURE

Scroll


PREMIUM LOTS (UP TO 863M2)
NOW SELLING

Find out more
Scroll

Artist impression


A SERIES OF THOUGHTFULLY DESIGNED
TOWNHOMES NOW SELLING


Find out more
Scroll

Artist impression

Scroll


BANKSIDE


WELCOME TO BANKSIDE

Make your home here and join an exclusive community in a convenient,
contemporary setting rich with natural beauty.

Nestled alongside lush parklands and the rejuvenated wetlands of Rowville’s
Corhanwarrabul Creek, Bankside will be an urban sanctuary of rare and remarkable
character.

An emphasis on quality design will ensure you live in a neighbourhood of
distinct character, with easy access to the site’s natural and built form
attractions, and the amenity of the wider Rowville community. 

01




VISION

02




LAND NOW SELLING

03




LOCATION


CONTACT

Bankside Sales Suite
14 Corporate Ave Rowville VIC 3178
Open via appointment
03 9684 8103

Rochelle Footman
Estate Agent
email




Register


 * Privacy policy
 * Due diligence checklist
 * Terms & Conditions
 * Design Review Portal

© Pask Places for Generations 2024

Close


REGISTER YOUR INTEREST TO RECEIVE ALL THE LATEST INFORMATION


BANKSIDE

First Name


Surname


Email


Phone Number


Postcode


 * Please select...
 * Land
 * Townhouse

What are you looking for? What are you looking for?

Please select... Land Townhouse
I have read and accept the Privacy Policy



Contact Information




 * Privacy Policy
 * Terms & Conditions


COMMENCEMENT OF BULK EARTHWORKS

Following receipt of all necessary approvals, Pask’s appointed civil contractor
will mobilise to site to remove any existing structures and commence bulk
earthworks.

Within this phase, machinery is used to shift large quantities of soil and rock,
to enable the subsequent phases of the civil construction process to occur. To
reduce waste, this material is often stockpiled and reused in the later phases.


CONSTRUCTION OF SEWER & DRAINAGE AND INSTALLATION OF WATER & GAS

Large trenches are excavated to allow for the installation of sewer and drainage
infrastructure. These works generally connect into and extend trunk
infrastructure from existing areas, to then enable the creation of individual
connection points for all lots within the stage.

Following the installation of sewer and drainage infrastructure, water, recycled
water, and gas (where applicable) services are installed.


CONSTRUCTION OF ROADS, KERB, AND CHANNEL

A foundation layer known as subgrade is placed to ensure the stability and
durability of all roads within the stage.

This process is followed by the construction of kerb and channel – a structure
located on both sides of the road, which will act as both a protective barrier
and drainage system to manage stormwater flows.


INSTALLATION OF ELECTRICAL AND COMMUNICATION INFRASTRUCTURE

Parallel to the newly completed kerb and channel, a trench is excavated to allow
for the installation of electrical and communications conduits. This enables the
installation of applicable cabling to follow, ensuring all lots are equipped for
electrical and telecommunications services.


CONSTRUCTION OF FOOTPATHS, ASPHALT TO ROADS AND TOPSOILING

With all underground infrastructure installed, footpaths are poured, and a final
layer of asphalt is applied and sealed to all roads. Lots are then topsoiled to
accord with finished surface levels, in line with approved engineering plans.


CONSTRUCTION COMPLETION AND REQUEST FOR AUTHORITY APPROVALS

At the completion of civil construction, the municipal council undertake an
assessment to confirm the completed works are in accordance with approved
engineering designs for that stage.

Formal approval or ‘Practical Completion’ is required prior to Pask and its
consultant team seeking final approval from the relevant service authorities
(ie. Melbourne Water, Powercor/Jemena etc). Once all authority approvals are
received, a final endorsement known as ‘Statement of Compliance’ is issued.


TITLE REGISTRATION AND SETTLEMENTS

The issuance of Statement of Compliance enables a certified Plan of Subdivision
to be lodged with Land Victoria for assessment and approval.

This approval will result in the formal registration of all individual lot
titles for the stage. At such time, we will issue correspondence to your legal
representative with an accompanying request to schedule settlement.


STAGE 5
0% COMPLETE




TITLE REGISTRATION:
Q2 2025 (ESTIMATED)



CONSTRUCTION PHASES

 * Authority Approval
 * Earthworks
 * Sewer & Drainage
 * Water & Gas
 * Subgrade
 * Kerb & Channel
 * Electrical & NBN
 * Footpaths & Asphalt
 * Construction Completion
 * Statement of Compliance
 * Titles & Plan Registration

Expected timeframes are provided as a guide only. Actual completion dates may
vary due to market and weather conditions, availability of resources, delays in
approvals or other factors.
Note – ‘% Complete’ relates to overall stage progress.

Construction Phases


BANKSIDE ROWVILLE




COMMENCEMENT OF BULK EARTHWORKS

Following receipt of all necessary approvals, Pask’s appointed civil contractor
will mobilise to site to remove any existing structures and commence bulk
earthworks.

Within this phase, machinery is used to shift large quantities of soil and rock,
to enable the subsequent phases of the civil construction process to occur. To
reduce waste, this material is often stockpiled and reused in the later phases.


CONSTRUCTION OF SEWER & DRAINAGE AND INSTALLATION OF WATER & GAS

Large trenches are excavated to allow for the installation of sewer and drainage
infrastructure. These works generally connect into and extend trunk
infrastructure from existing areas, to then enable the creation of individual
connection points for all lots within the stage.

Following the installation of sewer and drainage infrastructure, water, recycled
water, and gas (where applicable) services are installed.


CONSTRUCTION OF ROADS, KERB, AND CHANNEL

A foundation layer known as subgrade is placed to ensure the stability and
durability of all roads within the stage.

This process is followed by the construction of kerb and channel – a structure
located on both sides of the road, which will act as both a protective barrier
and drainage system to manage stormwater flows.


INSTALLATION OF ELECTRICAL AND COMMUNICATION INFRASTRUCTURE

Parallel to the newly completed kerb and channel, a trench is excavated to allow
for the installation of electrical and communications conduits. This enables the
installation of applicable cabling to follow, ensuring all lots are equipped for
electrical and telecommunications services.


CONSTRUCTION OF FOOTPATHS, ASPHALT TO ROADS AND TOPSOILING

With all underground infrastructure installed, footpaths are poured, and a final
layer of asphalt is applied and sealed to all roads. Lots are then topsoiled to
accord with finished surface levels, in line with approved engineering plans.


CONSTRUCTION COMPLETION AND REQUEST FOR AUTHORITY APPROVALS

At the completion of civil construction, the municipal council undertake an
assessment to confirm the completed works are in accordance with approved
engineering designs for that stage.

Formal approval or ‘Practical Completion’ is required prior to Pask and its
consultant team seeking final approval from the relevant service authorities
(ie. Melbourne Water, Powercor/Jemena etc). Once all authority approvals are
received, a final endorsement known as ‘Statement of Compliance’ is issued.


TITLE REGISTRATION AND SETTLEMENTS

The issuance of Statement of Compliance enables a certified Plan of Subdivision
to be lodged with Land Victoria for assessment and approval.

This approval will result in the formal registration of all individual lot
titles for the stage. At such time, we will issue correspondence to your legal
representative with an accompanying request to schedule settlement.


STAGE 4
0% COMPLETE




TITLE REGISTRATION:
Q3 2024 (ESTIMATED)



CONSTRUCTION PHASES

 * Authority Approval
 * Earthworks
 * Sewer & Drainage
 * Water & Gas
 * Subgrade
 * Kerb & Channel
 * Electrical & NBN
 * Footpaths & Asphalt
 * Construction Completion
 * Statement of Compliance
 * Titles & Plan Registration

Expected timeframes are provided as a guide only. Actual completion dates may
vary due to market and weather conditions, availability of resources, delays in
approvals or other factors.
Note – ‘% Complete’ relates to overall stage progress.

Construction Phases


BANKSIDE ROWVILLE




COMMENCEMENT OF BULK EARTHWORKS

Following receipt of all necessary approvals, Pask’s appointed civil contractor
will mobilise to site to remove any existing structures and commence bulk
earthworks.

Within this phase, machinery is used to shift large quantities of soil and rock,
to enable the subsequent phases of the civil construction process to occur. To
reduce waste, this material is often stockpiled and reused in the later phases.


CONSTRUCTION OF SEWER & DRAINAGE AND INSTALLATION OF WATER & GAS

Large trenches are excavated to allow for the installation of sewer and drainage
infrastructure. These works generally connect into and extend trunk
infrastructure from existing areas, to then enable the creation of individual
connection points for all lots within the stage.

Following the installation of sewer and drainage infrastructure, water, recycled
water, and gas (where applicable) services are installed.


CONSTRUCTION OF ROADS, KERB, AND CHANNEL

A foundation layer known as subgrade is placed to ensure the stability and
durability of all roads within the stage.

This process is followed by the construction of kerb and channel – a structure
located on both sides of the road, which will act as both a protective barrier
and drainage system to manage stormwater flows.


INSTALLATION OF ELECTRICAL AND COMMUNICATION INFRASTRUCTURE

Parallel to the newly completed kerb and channel, a trench is excavated to allow
for the installation of electrical and communications conduits. This enables the
installation of applicable cabling to follow, ensuring all lots are equipped for
electrical and telecommunications services.


CONSTRUCTION OF FOOTPATHS, ASPHALT TO ROADS AND TOPSOILING

With all underground infrastructure installed, footpaths are poured, and a final
layer of asphalt is applied and sealed to all roads. Lots are then topsoiled to
accord with finished surface levels, in line with approved engineering plans.


CONSTRUCTION COMPLETION AND REQUEST FOR AUTHORITY APPROVALS

At the completion of civil construction, the municipal council undertake an
assessment to confirm the completed works are in accordance with approved
engineering designs for that stage.

Formal approval or ‘Practical Completion’ is required prior to Pask and its
consultant team seeking final approval from the relevant service authorities
(ie. Melbourne Water, Powercor/Jemena etc). Once all authority approvals are
received, a final endorsement known as ‘Statement of Compliance’ is issued.


TITLE REGISTRATION AND SETTLEMENTS

The issuance of Statement of Compliance enables a certified Plan of Subdivision
to be lodged with Land Victoria for assessment and approval.

This approval will result in the formal registration of all individual lot
titles for the stage. At such time, we will issue correspondence to your legal
representative with an accompanying request to schedule settlement.


STAGE 3
0% COMPLETE




TITLE REGISTRATION:
Q3 2024 (ESTIMATED)



CONSTRUCTION PHASES

 * Authority Approval
 * Earthworks
 * Sewer & Drainage
 * Water & Gas
 * Subgrade
 * Kerb & Channel
 * Electrical & NBN
 * Footpaths & Asphalt
 * Construction Completion
 * Statement of Compliance
 * Titles & Plan Registration

Expected timeframes are provided as a guide only. Actual completion dates may
vary due to market and weather conditions, availability of resources, delays in
approvals or other factors.
Note – ‘% Complete’ relates to overall stage progress.

Construction Phases


BANKSIDE ROWVILLE




COMMENCEMENT OF BULK EARTHWORKS

Following receipt of all necessary approvals, Pask’s appointed civil contractor
will mobilise to site to remove any existing structures and commence bulk
earthworks.

Within this phase, machinery is used to shift large quantities of soil and rock,
to enable the subsequent phases of the civil construction process to occur. To
reduce waste, this material is often stockpiled and reused in the later phases.


CONSTRUCTION OF SEWER & DRAINAGE AND INSTALLATION OF WATER & GAS

Large trenches are excavated to allow for the installation of sewer and drainage
infrastructure. These works generally connect into and extend trunk
infrastructure from existing areas, to then enable the creation of individual
connection points for all lots within the stage.

Following the installation of sewer and drainage infrastructure, water, recycled
water, and gas (where applicable) services are installed.


CONSTRUCTION OF ROADS, KERB, AND CHANNEL

A foundation layer known as subgrade is placed to ensure the stability and
durability of all roads within the stage.

This process is followed by the construction of kerb and channel – a structure
located on both sides of the road, which will act as both a protective barrier
and drainage system to manage stormwater flows.


INSTALLATION OF ELECTRICAL AND COMMUNICATION INFRASTRUCTURE

Parallel to the newly completed kerb and channel, a trench is excavated to allow
for the installation of electrical and communications conduits. This enables the
installation of applicable cabling to follow, ensuring all lots are equipped for
electrical and telecommunications services.


CONSTRUCTION OF FOOTPATHS, ASPHALT TO ROADS AND TOPSOILING

With all underground infrastructure installed, footpaths are poured, and a final
layer of asphalt is applied and sealed to all roads. Lots are then topsoiled to
accord with finished surface levels, in line with approved engineering plans.


CONSTRUCTION COMPLETION AND REQUEST FOR AUTHORITY APPROVALS

At the completion of civil construction, the municipal council undertake an
assessment to confirm the completed works are in accordance with approved
engineering designs for that stage.

Formal approval or ‘Practical Completion’ is required prior to Pask and its
consultant team seeking final approval from the relevant service authorities
(ie. Melbourne Water, Powercor/Jemena etc). Once all authority approvals are
received, a final endorsement known as ‘Statement of Compliance’ is issued.


TITLE REGISTRATION AND SETTLEMENTS

The issuance of Statement of Compliance enables a certified Plan of Subdivision
to be lodged with Land Victoria for assessment and approval.

This approval will result in the formal registration of all individual lot
titles for the stage. At such time, we will issue correspondence to your legal
representative with an accompanying request to schedule settlement.


STAGE 2
0% COMPLETE




TITLE REGISTRATION STATUS:
TITLED



CONSTRUCTION PHASES

 * Authority Approval
 * Earthworks
 * Sewer & Drainage
 * Water & Gas
 * Subgrade
 * Kerb & Channel
 * Electrical & NBN
 * Footpaths & Asphalt
 * Construction Completion
 * Statement of Compliance
 * Titles & Plan Registration

Expected timeframes are provided as a guide only. Actual completion dates may
vary due to market and weather conditions, availability of resources, delays in
approvals or other factors.

Note – ‘% Complete’ relates to overall stage progress.

Construction Phases


BANKSIDE ROWVILLE




COMMENCEMENT OF BULK EARTHWORKS

Following receipt of all necessary approvals, Pask’s appointed civil contractor
will mobilise to site to remove any existing structures and commence bulk
earthworks.

Within this phase, machinery is used to shift large quantities of soil and rock,
to enable the subsequent phases of the civil construction process to occur. To
reduce waste, this material is often stockpiled and reused in the later phases.


CONSTRUCTION OF SEWER & DRAINAGE AND INSTALLATION OF WATER & GAS

Large trenches are excavated to allow for the installation of sewer and drainage
infrastructure. These works generally connect into and extend trunk
infrastructure from existing areas, to then enable the creation of individual
connection points for all lots within the stage.

Following the installation of sewer and drainage infrastructure, water, recycled
water, and gas (where applicable) services are installed.


CONSTRUCTION OF ROADS, KERB, AND CHANNEL

A foundation layer known as subgrade is placed to ensure the stability and
durability of all roads within the stage.

This process is followed by the construction of kerb and channel – a structure
located on both sides of the road, which will act as both a protective barrier
and drainage system to manage stormwater flows.


INSTALLATION OF ELECTRICAL AND COMMUNICATION INFRASTRUCTURE

Parallel to the newly completed kerb and channel, a trench is excavated to allow
for the installation of electrical and communications conduits. This enables the
installation of applicable cabling to follow, ensuring all lots are equipped for
electrical and telecommunications services.


CONSTRUCTION OF FOOTPATHS, ASPHALT TO ROADS AND TOPSOILING

With all underground infrastructure installed, footpaths are poured, and a final
layer of asphalt is applied and sealed to all roads. Lots are then topsoiled to
accord with finished surface levels, in line with approved engineering plans.


CONSTRUCTION COMPLETION AND REQUEST FOR AUTHORITY APPROVALS

At the completion of civil construction, the municipal council undertake an
assessment to confirm the completed works are in accordance with approved
engineering designs for that stage.

Formal approval or ‘Practical Completion’ is required prior to Pask and its
consultant team seeking final approval from the relevant service authorities
(ie. Melbourne Water, Powercor/Jemena etc). Once all authority approvals are
received, a final endorsement known as ‘Statement of Compliance’ is issued.


TITLE REGISTRATION AND SETTLEMENTS

The issuance of Statement of Compliance enables a certified Plan of Subdivision
to be lodged with Land Victoria for assessment and approval.

This approval will result in the formal registration of all individual lot
titles for the stage. At such time, we will issue correspondence to your legal
representative with an accompanying request to schedule settlement.


STAGE 1
0% COMPLETE




TITLE REGISTRATION STATUS:
TITLED



CONSTRUCTION PHASES

 * Authority Approval
 * Earthworks
 * Sewer & Drainage
 * Water & Gas
 * Subgrade
 * Kerb & Channel
 * Electrical & NBN
 * Footpaths & Asphalt
 * Construction Completion
 * Statement of Compliance
 * Titles & Plan Registration

Expected timeframes are provided as a guide only. Actual completion dates may
vary due to market and weather conditions, availability of resources, delays in
approvals or other factors.
Note – ‘% Complete’ relates to overall stage progress.