www.allaboutlean.com Open in urlscan Pro
185.30.32.52  Public Scan

URL: https://www.allaboutlean.com/smed-2-0/
Submission Tags: falconsandbox
Submission: On April 18 via api from US — Scanned from DE

Form analysis 3 forms found in the DOM

GET https://www.allaboutlean.com/

<form method="get" class="search-form navigation-search" action="https://www.allaboutlean.com/"> <input type="search" class="search-field" value="" name="s" title="Search"></form>

POST https://www.allaboutlean.com/wp-comments-post.php

<form action="https://www.allaboutlean.com/wp-comments-post.php" method="post" id="commentform" class="comment-form" novalidate="">
  <p class="comment-form-comment"><label for="comment" class="screen-reader-text">Comment</label><textarea autocomplete="new-password" id="comment" name="efc8ba4513" cols="45" rows="8" required=""></textarea><textarea
      id="aabdd836c0309398f1c06a686c355641" aria-label="hp-comment" aria-hidden="true" name="comment" autocomplete="new-password"
      style="padding:0 !important;clip:rect(1px, 1px, 1px, 1px) !important;position:absolute !important;white-space:nowrap !important;height:1px !important;width:1px !important;overflow:hidden !important;" tabindex="-1"></textarea>
    <script data-noptimize="">
      document.getElementById("comment").setAttribute("id", "aabdd836c0309398f1c06a686c355641");
      document.getElementById("efc8ba4513").setAttribute("id", "comment");
    </script>
  </p><label for="author" class="screen-reader-text">Name</label><input placeholder="Name *" id="author" name="author" type="text" value="" size="30" required=""> <label for="email" class="screen-reader-text">Email</label><input placeholder="Email *"
    id="email" name="email" type="email" value="" size="30" required=""> <label for="url" class="screen-reader-text">Website</label><input placeholder="Website" id="url" name="url" type="url" value="" size="30">
  <p class="comment-subscription-form"><input type="checkbox" name="subscribe_blog" id="subscribe_blog" value="subscribe" style="width: auto; -moz-appearance: checkbox; -webkit-appearance: checkbox;"> <label class="subscribe-label"
      id="subscribe-blog-label" for="subscribe_blog">Notify me of new posts by email.</label></p>
  <p class="form-submit"><input name="submit" type="submit" id="submit" class="submit" value="Post Comment"> <input type="hidden" name="comment_post_ID" value="30351" id="comment_post_ID"> <input type="hidden" name="comment_parent"
      id="comment_parent" value="0"></p>
</form>

POST #

<form action="#" method="post" accept-charset="utf-8" id="subscribe-blog-blog_subscription-4" data-blog="56866218" data-post_access_level="everybody">
  <p id="subscribe-email"> <label id="jetpack-subscribe-label" class="screen-reader-text" for="subscribe-field-blog_subscription-4"> Email Address </label> <input type="email" name="email" required="required" value=""
      id="subscribe-field-blog_subscription-4" placeholder="Email Address"></p>
  <p id="subscribe-submit"> <input type="hidden" name="action" value="subscribe"> <input type="hidden" name="source" value="https://www.allaboutlean.com/smed-2-0/"> <input type="hidden" name="sub-type" value="widget"> <input type="hidden"
      name="redirect_fragment" value="subscribe-blog-blog_subscription-4"> <input type="hidden" id="_wpnonce" name="_wpnonce" value="c3982392a5"><input type="hidden" name="_wp_http_referer" value="/smed-2-0/"> <button type="submit"
      class="wp-block-button__link" name="jetpack_subscriptions_widget"> Subscribe </button></p>
</form>

Text Content

Skip to consent choices
Privacy preferences


We use cookies and similar technologies on our website and process your personal
data (e.g. IP address), for example, to personalize content and ads, to
integrate media from third-party providers or to analyze traffic on our website.
Data processing may also happen as a result of cookies being set. We share this
data with third parties that we name in the privacy settings.

The data processing may take place with your consent or on the basis of a
legitimate interest, which you can object to in the privacy settings. You have
the right not to consent and to change or revoke your consent at a later time.
For more information on the use of your data, please visit our privacy policy.



You are under 16 years old? Unfortunately, you are not permitted to consent to
this service to view this content. Please ask your parents or guardians to agree
to the service with you!

By accepting all services, you allow X (former Twitter)2(Functional), Google
reCAPTCHA2(Functional), YouTube2(Functional), Comments2(Functional), VG
WORT3(Statistics) and Jetpack Site Stats3(Statistics) to be loaded. These
services are divided into groups Essential1, Functional2 and Statistics3
according to their purpose (belonging marked with superscript numbers). In
addition, Polylang1(Essential) are loaded based on a legitimate interest.

Accept allContinue without consentSet privacy settings individually

Privacy policy • Imprint • EnglishDeutsch中文 (中国) • Cookie Consent with Real
Cookie Banner

Skip to content


Menu
 * About
   * About
   * Awards
   * Credits
   * Prof. Dr. Christoph Roser
   * Contact
 * Content
   * All Posts and Pages
   * All Categories and Tags
   * Permission for Translations
   * Permission for Images
   * XML Sitemap
   * RSS feed
 * Consulting
   * Consulting
   * Public Speaking
   * Trainings
   * Contact
 * Books
   * All About Pull Production
   * Translations of All About Pull Production
   * Fertigungstechnik (in German)
   * Collected Blog Posts
   * Font Samples
   * Publications and Presentations
 * Need help?
   * Ask me a Question!
   * Glossary
 * English
 * 


SMED 2.0—A CHANGEOVER FOR THE CHANGEOVER

April 27, 2023April 25, 2023 by Christoph Roser

Single Minute Exchange of Die (SMED) to reduce and shorten changeover times is
one of the best-known methods in lean manufacturing. However, the original steps
as shown by Shingo have, in my view, potential for improvement. Hence, I
restructured the changeover workshop based on my experience with SMED to make it
easier and more straightforward. This rework is not groundbreaking or
revolutionary, but merely a few small changes to make it easier to use. As it is
popular nowadays, I also added a 2.0 after SMED for my SMED 2.0.


INTRODUCTION

Danly Press Toyota Industry Museum

The classical SMED by Shingo is based on the quick changeover workshops at
Toyota, which in themselves were inspired by many other companies and
individuals. The classic steps by Shingo are as follows.

 1. Measure changeover times.
 2. Identify internal and external elements.
 3. Move as many elements as possible to external.
 4. Shorten internal elements.
 5. Shorten external elements.
 6. Standardize and maintain new procedure.

While this contains all the relevant elements for a SMED, the arrangement could
be better. I am also missing the verification whether the new sequence actually
works and the PDCA at the end. Hence, let me redo the sequence:


SMED 2.0

As with any improvement, you should first identify and prioritize what you want
to improve. Once you know your topic, you should set up a small team of people
qualified in the topic and give them time to work. With these basics out of the
way, let’s start SMED 2.0.


CURRENT STATE CHANGEOVER

The first step is, of course, an analysis of the current state of the
changeover. Observe a typical changeover (maybe video it if the employees
agree). Follow all people involved in the changeover and see what they do and
how long it takes. Also take note when the main process is stopped, when it was
started again, and when the first good part at full speed was produced. The last
two points may be identical, but sometimes there is some set-up, adjustments,
warm-ups, or similar activities between starting the process and regular
production. Sometimes you may also find a ramp-down procedure at the beginning
in addition to the ramp-up at the end. The goal is to reduce the lost
productivity, including the ramp-down, the fully stopped period, and the
ramp-up. Using the nomenclature of Shingo, I also call these the internal steps,
whereas the preparation before and the wrap up after are external steps.




Ideally, at the end you have an Excel table with a list of steps, their
sequence, and their duration. Common pitfalls are overlooking some early
preparations that happened before the stop of the machine. You may also observe
more than one changeover, although often only one changeover is observed,
relying on the knowledge of the people on the improvement team to know the
differences in the changeovers.


MOVE INTERNAL TO EXTERNAL

The next step is to look closer at the tasks between the ramp-down and the
ramp-up of the process. Which ones can you move before or after to the
preparations or wrap-up? Are there steps that can be eliminated completely? What
is necessary to do so? A mere organizational change? A technical change? A
better tool? An extra employee to help out? How long will it take to implement?


SHORTEN INTERNAL STEPS

You should also look at the remaining steps between start of ramp-down and end
of ramp-up. Can you shorten them, or even eliminate them completely? Can you
make them easier? How much effort is it to make the change, and how long will it
take? If during this round of the workshop you have another idea to move the
step outside of lost productivity, then do it!


SHORTEN EXTERNAL STEPS

Similarly, you should also look at the preparation before and the wrap-up after
the changeover, the external steps (including the ones you just moved to
external). Can they be shortened, eliminated, or made easier? How much effort is
it to make the change, and how long will it take?

Please note that the shortening of external steps is much less important than
the moving and shortening of internal steps. Reducing external steps reduces the
time for the employees to do the changeover, which—depending on the duration and
the frequency of the changeover—may be worthwhile. However, reducing or
eliminating internal steps will give you much more benefit. Besides the
reduction of the time for the workers doing the changeover, you also get
(probably much needed) production capacity…or, even better, smaller lot sizes.
If you can move an internal step to external, it is worth it even if it takes
longer externally.


VERIFICATION AND ITERATION

Missing in the original Shingo structure is the verification and iteration. At
the end, you should check whether the new changeover sequence is doable. If you
can, try it out with a real changeover. It may very well be that the new
sequence has a bug, and two steps clash with each other. Such problems have to
be resolved.

If you are also not yet satisfied with the new duration, you may iterate and go
through the steps again. Is there any more time to be gained during the
changeover internally (best) or externally (also good)?

If you need larger technical changes, you may depend on delivery and/or
installation of your new gadgets. Will you wait with the new standard until
these arrive, or is it worth the effort to have an interim standard?




STANDARDIZATION

Once you and your people have agreed on a new changeover sequence, this needs to
be put down in a new standard, and the workers need to be trained in the new
standard.


PDCA

As always, don’t forget the PDCA. Do process confirmation to see whether the
standard works and is still followed even some time after the workshop. If not,
is the standard flawed, or do the operators need more training or supervision?

While I hope you are familiar with SMED, I also hope this post restructured it a
bit. Again, it is not a major change, but a bit of twiddling and improving. Now,
go out, reduce your changeover time so you can have smaller lot sizes, and
organize your industry!

PS: Also check out my many other posts on SMED if you want 🙂

 * Quick Changeover Basics – SMED
 * The History of Quick Changeover (SMED)
 * SMED – Creative Quick Changeover Exercises and Training
 * What to Do with SMED: Reduce Lot Size or Increase Work Time?
 * Series on changeover sequencing

 

Categories Lean Tools, NoRepost Tags NoRepost, SMED
The Danger of Management by Numbers
Stack Lights—Visual Management Done Easy


LEAVE A COMMENT

Comment

Name Email Website

Notify me of new posts by email.




GET NEW POSTS BY EMAIL

Email Address

Subscribe


ALL ABOUT PULL PRODUCTION

Detailed explanation on pull systems for practicioners, recipient of the Shingo
Publication Award: Roser, Christoph, 2021: “All About Pull Production:
Designing, Implementing, and Maintaining Kanban, CONWIP, and other Pull Systems
in Lean Production. 441 pages, AllAboutLean.com Publishing 2021.
This book is also translated into many other languages.



TAGS

amazon Analysis Bottleneck CONWIP Critical Thinking Decision Making Efficiency
Fails FiFo Fluctuation History Industry 4.0 Information Flow Inventory Job Shop
Kaizen Kanban KPI Lean Tools Leveling Maintenance Management Material Flow
Motivation Muda NoRepost PDCA Plant Tour Practice Problem Solving Process
Confirmation Psychology Pull Quality Sequencing Shopfloor SMED Speed Standard
Toyota TPM Training Van of Nerds Visualization Waste


LATEST POSTS

 * The Evolution of Automotive Assembly Line—Part 1April 16, 2024
 * The BMW Finger Line LayoutApril 9, 2024
 * Variable Takt at Fendt in Marktoberdorf—Part 3April 2, 2024
 * Variable Takt at Fendt in Marktoberdorf—Part 2March 26, 2024
 * Variable Takt at Fendt in Marktoberdorf—Part 1March 19, 2024
 * Using Empty Slots on the Assembly LineMarch 12, 2024
 * The Two Directions of Poka YokeMarch 5, 2024
 * Different Aspects of Seeing a Shop Floor—DataFebruary 27, 2024
 * Different Aspects of Seeing a Shop Floor—Gemba vs. DataFebruary 20, 2024
 * Different Aspects of Seeing a Shop Floor—Unevenness, Overburden, and
   SafetyFebruary 13, 2024

© Copyright AALean GmbH 2024. For image copyrights please click on the images.
Impressum (Imprint) ● Privacy Policy ● Contact
Use all information provided on this site at your own risk!