ferpalinfrastructure.com Open in urlscan Pro
35.208.80.153  Public Scan

Submitted URL: http://ferpalinfrastructure.com/
Effective URL: https://ferpalinfrastructure.com/
Submission: On November 05 via api from US — Scanned from DE

Form analysis 1 forms found in the DOM

POST /#gf_1

<form method="post" enctype="multipart/form-data" target="gform_ajax_frame_1" id="gform_1" action="/#gf_1">
  <input type="hidden" class="gforms-pum" value="{&quot;closepopup&quot;:false,&quot;closedelay&quot;:0,&quot;openpopup&quot;:false,&quot;openpopup_id&quot;:0}">
  <div class="gform_body gform-body">
    <ul id="gform_fields_1" class="gform_fields top_label form_sublabel_below description_below">
      <li id="field_1_1" class="gfield field_sublabel_below field_description_below gfield_visibility_visible" data-js-reload="field_1_1"><label class="gfield_label" for="input_1_1">Name</label>
        <div class="ginput_container ginput_container_text"><input name="input_1" id="input_1_1" type="text" value="" class="medium" placeholder="Name" aria-invalid="false"> </div>
      </li>
      <li id="field_1_2" class="gfield field_sublabel_below field_description_below gfield_visibility_visible" data-js-reload="field_1_2"><label class="gfield_label" for="input_1_2">Email</label>
        <div class="ginput_container ginput_container_text"><input name="input_2" id="input_1_2" type="text" value="" class="medium" placeholder="Email" aria-invalid="false"> </div>
      </li>
    </ul>
  </div>
  <div class="gform_footer top_label"> <input type="submit" id="gform_submit_button_1" class="gform_button button" value="Submit" onclick="if(window[&quot;gf_submitting_1&quot;]){return false;}  window[&quot;gf_submitting_1&quot;]=true;  "
      onkeypress="if( event.keyCode == 13 ){ if(window[&quot;gf_submitting_1&quot;]){return false;} window[&quot;gf_submitting_1&quot;]=true;  jQuery(&quot;#gform_1&quot;).trigger(&quot;submit&quot;,[true]); }"> <input type="hidden" name="gform_ajax"
      value="form_id=1&amp;title=&amp;description=&amp;tabindex=0">
    <input type="hidden" class="gform_hidden" name="is_submit_1" value="1">
    <input type="hidden" class="gform_hidden" name="gform_submit" value="1">
    <input type="hidden" class="gform_hidden" name="gform_unique_id" value="">
    <input type="hidden" class="gform_hidden" name="state_1" value="WyJbXSIsIjA0YWFmYzRlMjQ3ODI1NDk0ODVlNDhhYjQ0NzczOGZlIl0=">
    <input type="hidden" class="gform_hidden" name="gform_target_page_number_1" id="gform_target_page_number_1" value="0">
    <input type="hidden" class="gform_hidden" name="gform_source_page_number_1" id="gform_source_page_number_1" value="1">
    <input type="hidden" name="gform_field_values" value="">
  </div>
</form>

Text Content

 * About Us
   * Mission Statement
   * FER-PAL’s Awards
   * Health and Safety
 * Services
   * Structural Pipe Lining Solution
   * Other Rehabilitation Solutions
 * Sustainability
 * Customers
 * Projects
   * Videos
   * Images
 * Contact Us
   * News
   * Careers
   * F.A.Q’s
   * Emergency Contact Numbers
   * Door Knocker Notices
 * Menu Menu




 * CIPP: KEEPING BUSINESSES OPEN
   
   When it comes to choosing technologies to replace or rehabilitate an aging
   watermain the choice is simple. More digging = more disruption. ALTRA CIPP
   provides a trenchless solution that requires minimal excavation. This
   prevents disruptions to businesses and residents, allowing for a normal
   day-to-day life, even during construction.
   
   
   
   
   


 * CIPP: THE TREE SAVING SOLUTION
   
   When watermains were initially installed, trees were often placed above them.
   When that watermain requires replacement, utility owners have historically
   had to replace the trees as well. Unfortunately, 100-year old trees cannot be
   bought at the local greenhouse. Now with ALTRA CIPP, utility owners can
   rehabilitate their aging watermains without excavating, preventing harm to
   these irreplaceable trees.
   
   
   
   
   


 * CIPP: FROM DESIGN TO COMPLETE PROJECT IN UNDER A YEAR
   
   The speed at which a cured-in-place watermain project can be completed
   provides a unique advantage compared to using ALTRA CIPP. The traditional
   practice of open-cut construction comes with higher costs and delays that can
   be avoided by using less disruptive methods of construction. If you have a
   watermain that requires rehabilitation, avoid the delays and go with FER-PAL.
   
   
   
   
   

PreviousNext
123


ABOUT US

Established in 1986, FER-PAL Construction Ltd. is a trenchless technology
company that offers complete watermain rehabilitation solutions. FER-PAL
specializes in projects utilizing trenchless technologies of all types and sizes
for municipalities across Canada and the United States.

DOWNLOAD THE BROCHURE


SERVICES WE OFFER


ALTRA CIPP – STRUCTURAL PIPE LINING SOLUTIONS

When it comes to water, your safety is our priority. FER-PAL provides immediate
and permanent lining solutions without disruption to homes or business and at a
lower cost than open-cut methods. FER–PAL is a licensed installer of ALTRA CIPP,
the leading product used for trenchless structural watermain rehabilitation.


Learn More


WATERMAIN TRENCHLESS TECHNOLOGIES

FER–PAL has experience in a variety of advanced watermain trenchless
technologies. As a watermain rehab expert, FER–PAL deploys various methods to
restore aging watermains and water services of all shapes and sizes.  This
includes the Neofit®+Plus Potable Pipe Lining System – a non-invasive option for
Lead Replacement Programs.


Learn More


LATEST WORK


CITY OF TORONTO 19TW-CTS-01




Location:  City of Toronto
Pipe Size: 150mm, 300mm
Project Length: 4,500m
Budget: $13,447,221.48

Learn More


CITY OF HAMILTON MULTI-YEAR PROJECT




Location: City of Hamilton (various sites)
Pipe Size: 150mm – 400mm
Project Length: 6,293m
Budget: $7,665,591

Learn More


EMERGENCY WATERMAIN REHAB




Location: John St.
Pipe Size: 600 mm (24”)
Project Length: 516m
Budget: $2,170,000

Learn More


WHAT TO EXPECT


IS FER-PAL WORKING IN YOUR NEIGHBOURHOOD?

Our leading-edge technology makes for non-invasive work. 




Visit our Frequently Asked Questions Page

How long will the construction be continuing in my neighbourhood?

All jobs and job sites are different. It is difficult to estimate how long a job
will take to complete. Residents are usually on our temporary water supply for
approximately three weeks.

Will the rehabilitation process increase my water pressure?

No, it will not. Water volume may increase but local pressure will remain
constant. Most residents experience a greater volume while they are connected to
our temporary water supply as a result of the size of the hose connected to your
outside tap. Once this hose is removed, normal water volume will resume. The
only way to permanently increase water volume is to increase the size of the
water service pipe that runs from the water main to your home. Installing a new
water service is not a service that FER-PAL supplies.

Will I be notified in advance of when a scheduled shut-off is to occur?

Yes. During the rehabilitation process residents and commercial establishments
will be notified (via hand-delivered letters), of the time and date(s) of when
the water will be shut off for lining purposes and hydrant and valve
repairs/replacements as per contract requirement. It is necessary when lining
the pipe to shut off the water supply to eliminate any leaking water from
escaping back in through your service into the pipe which will disturb the
cement mortar from setting.

Can I still flush my toilet during the water shut-off?

Yes. The tank in the back of the toilet must be three quarters full in order for
the toilet to flush. Reserve a supply of water by filling your bathtub. Simply
use a bucket to replenish the toilet’s reserve tank after each flush.

Need more answers?


CUSTOMERS WE WORK WITH

Some of the municipalities we’ve worked with who trust FER-PAL to rehabilitate
their watermains and provide superior pipe-lining replacement.


 
PreviousNext


REQUEST INFORMATION

Send us a message and we'll send you an information packet shortly.
 * Name
   
 * Email
   



ACCESSIBILITY STANDARDS

FER-PAL CONSTRUCTION LTD.

171 Fenmar Drive, Toronto, Ontario M9L1M7 Canada Tel: 416-742-3713 Fax:
416-742-3889 Toll Free: 1-866-344-1058 info@ferpalinfrastructure.com


FOLLOW US

 * facebook
 * twitter
 * linkedin
 * youtube

FER-PAL CONSTRUCTION USA LLC.

26187 Northline Road Taylor, Michigan 48180 USA Tel: 734-946-2034 Fax:
734-946-2036 info@ferpalinfrastructure.com

FER-PAL CONSTRUCTION USA LLC.

1350 Gasket Dr. Elgin, IlIinois 60120 USA Tel: 847-214-0103 Fax: 847-214-0104
info@ferpalinfrastructure.com
© Copyright 2021. FER-PAL Construction Ltd.
 * Facebook
 * LinkedIn
 * Twitter
 * Youtube

Scroll to top


Notifications